Both sides previous revisionPrevious revisionNext revision | Previous revision |
3135 [2024/03/27 10:07] – sigridundset | 3135 [2024/04/06 09:17] (current) – sigridundset |
---|
====== 3135 345kV ====== | ====== 3135 345kV ====== |
| |
| {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} |
| |
{{ :3135:a-126_s-153_3135.pdf |2023, June 3, withdrawn DES permit application for construction}} | {{ :3135:a-126_s-153_3135.pdf |2023, June 3, withdrawn DES permit application for construction}} |
| |
{{ ::4-cr-2021-020-engy-staff-recommendation.pdf |2021, December 7: DOE recommendation}} | {{ :3135:license-granted.pdf |2022, January 18: permit for crossing Great Bog}} |
| |
{{ ::2-cr-2021-020-petition.pdf |2021, November 12: petition for crossing Great Bog, structures 105 and 106, "The 3135 Line’s existing three conductors, one static wire and one OPGW communications wire, whose specifications are identified on the Exhibit 4 Cable Schedule, will be unchanged in the course of relocation to the new replacement structures"}} | |
| |
{{ ::cr-2021-20-3135line-oon.pdf |2021, December 16: order of notice }} | {{ ::cr-2021-20-3135line-oon.pdf |2021, December 16: order of notice }} |
| |
{{ ::20-103_2020-08-14_staff_rec.pdf |2020, August 14: safety department review}} | {{ ::4-cr-2021-020-engy-staff-recommendation.pdf |2021, December 7: staffrecommendation}} |
| |
| {{ :3135:3135_2021-20-3135line-oon.pdf |2021, November 17: Petition for crossing the Great Bog; structures 105 and 106, "Three existing conductors, one static wire and one OPGW communications wire will be transferred to the new structures."}} |
| |
| {{ :3135:exhibits_1-4.pdf |2021, July 28: exhibits for 11/17 petition to cross the Great Bog, 1113 ASCR 54/19, 7#8 Alumoweld static/ground wire, 74 fiber.637 OPGW}} |
| |
| {{ :goslingrd_300_cc_cup_120821.pdf |2021, November 16: conditional use permit}} |
| |
| {{ ::2-cr-2021-020-petition.pdf |2021, November 12: petition for crossing Great Bog, structures 105 and 106, "The 3135 Line’s existing three conductors, one static wire and one OPGW communications wire, whose specifications are identified on the Exhibit 4 Cable Schedule, will be unchanged in the course of relocation to the new replacement structures"}} |
| |
{{ :3135:3135_2021-20-3135line-oon.pdf |2021, November 17: Petition for crossing the Great Bog; "Three existing conductors, one static wire and one OPGW communications wire will be transferred to the new structures."}} | |
| |
{{ :goslingrd_300_cc_cup_120821.pdf |2021, November 16: condition use permit}} | |