====== 3135 345kV ====== | ====== 3135 345kV ====== |
| |
| {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} |
| |
{{ :3135:a-126_s-153_3135.pdf |2023, June 3, withdrawn DES permit application for construction}} | {{ :3135:a-126_s-153_3135.pdf |2023, June 3, withdrawn DES permit application for construction}} |
{{ ::2-cr-2021-020-petition.pdf |2021, November 12: petition for crossing Great Bog, structures 105 and 106, "The 3135 Line’s existing three conductors, one static wire and one OPGW communications wire, whose specifications are identified on the Exhibit 4 Cable Schedule, will be unchanged in the course of relocation to the new replacement structures"}} | {{ ::2-cr-2021-020-petition.pdf |2021, November 12: petition for crossing Great Bog, structures 105 and 106, "The 3135 Line’s existing three conductors, one static wire and one OPGW communications wire, whose specifications are identified on the Exhibit 4 Cable Schedule, will be unchanged in the course of relocation to the new replacement structures"}} |
| |
{{ :3135:staff_recommendation.pdf |2021, November 7, staff recommendation re. crossing}} | |
| |
{{ ::20-103_2020-08-14_staff_rec.pdf |2020, August 14: staff recommendation and exhibits. "This is a project to replace two structures on the existing 3195 transmission line. The existing static wire will be replaced with optical ground wire, which is being replaced from other structures beyond the boundary of state-owned land."}} | |