====== 3135 345kV ====== | ====== 3135 345kV ====== |
| |
| {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} |
| |
{{ :3135:a-126_s-153_3135.pdf |2023, June 3, withdrawn DES permit application for construction}} | {{ :3135:a-126_s-153_3135.pdf |2023, June 3, withdrawn DES permit application for construction}} |
{{ ::2-cr-2021-020-petition.pdf |2021, November 12: petition for crossing Great Bog, structures 105 and 106, "The 3135 Line’s existing three conductors, one static wire and one OPGW communications wire, whose specifications are identified on the Exhibit 4 Cable Schedule, will be unchanged in the course of relocation to the new replacement structures"}} | {{ ::2-cr-2021-020-petition.pdf |2021, November 12: petition for crossing Great Bog, structures 105 and 106, "The 3135 Line’s existing three conductors, one static wire and one OPGW communications wire, whose specifications are identified on the Exhibit 4 Cable Schedule, will be unchanged in the course of relocation to the new replacement structures"}} |
| |
{{ ::20-103_2020-08-14_staff_rec.pdf |2020, August 14: staff recommendation and exhibits. "The structure will have conductors for the 345 kV 3195 transmission line consisting of (3) 850.8 kcmil ACSR 45/7 cables. The fiber optic cables consisting of (1) 48 Fiber OPGW and (1) 84 Fiber OPGW will be vertically attached above the conductors }} | |