 373 345kV Line 373 345kV Line
  
 +{{ :373:a02_eversource_nh_acr_385_373_391.pdf |2025, June 16: PAC presentation on continued structure replacements on 345k lines 373, 385 and 391. $16 m. total}}
  
-{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}+{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}
  
-{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18presentation to PAC, replace 34 out of 178 structures; $10.3 million}}+{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18presentation to PAC, replace 34 out of 178 structures; $10.3 million}}
  
 {{ :373:2023-02-28-field-inspection-2023224341.pdf |2023, February 28: "The purpose of the [DES] site inspection was in response to concerns about construction practices.: }} {{ :373:2023-02-28-field-inspection-2023224341.pdf |2023, February 28: "The purpose of the [DES] site inspection was in response to concerns about construction practices.: }}
Line 18: Line 19:
 {{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending}} {{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending}}
  
-{{ :a3_eversource_new_hampshire_asset_conditions_wood_structure_replacement.pdf |2022, June 15 report to PAC, replace 25 out of 169 structures; $8.6 m}}+{{ :a3_eversource_new_hampshire_asset_conditions_wood_structure_replacement.pdf |2022, June 15: presentation to PAC, replace 25 out of 169 structures; $8.6 m}}
  
 {{ :373:385-_373-_391_natural_heritage_bureau.pdf |2022, May 20: Natural Heritage Bureau}} {{ :373:385-_373-_391_natural_heritage_bureau.pdf |2022, May 20: Natural Heritage Bureau}}
Line 33: Line 34:
  
 {{ ::de-20-195-order-26-468.pdf |2021, April 7: order granting Lamprey river crossing}} {{ ::de-20-195-order-26-468.pdf |2021, April 7: order granting Lamprey river crossing}}
 +
 +{{ :373:373_012121_pac_minutes_final.pdf |2021, January 21: Minutes of PAC meeting.}}
  
 {{ ::a4_eversource_345kv_structure_replacement_2020_2021.pdf |2021, January 21: presentation to PAC, 22 structures out of 178 replaced, $9.8 m}} {{ ::a4_eversource_345kv_structure_replacement_2020_2021.pdf |2021, January 21: presentation to PAC, 22 structures out of 178 replaced, $9.8 m}}
- 
-{{ :373:373_2021.pdf |2021, January 21: Presentation to PAC  }} 
  
 {{ :373:2020_puc_crossing_373_scobie_pond_to_deerfield_ss_opgw.pdf |2020, December 22: petition to cross Lamprey River; "The proposed project for the 373 Line will complete installation of OPGW communications cable between the Deerfield substation and Scobie Pond substation in Derry. The only other PUC crossing span between those terminating substations, located between Structures 242 to 243 in Raymond, was licensedfor both structure replacement (wood to steel) and OPGW communications cable installation pursuant to Order 26,402 in Docket DE 20-033, so this petition will complete structure replacement and communications functionality reliability upgrades between those terminating substations for the 373 Line."}} {{ :373:2020_puc_crossing_373_scobie_pond_to_deerfield_ss_opgw.pdf |2020, December 22: petition to cross Lamprey River; "The proposed project for the 373 Line will complete installation of OPGW communications cable between the Deerfield substation and Scobie Pond substation in Derry. The only other PUC crossing span between those terminating substations, located between Structures 242 to 243 in Raymond, was licensedfor both structure replacement (wood to steel) and OPGW communications cable installation pursuant to Order 26,402 in Docket DE 20-033, so this petition will complete structure replacement and communications functionality reliability upgrades between those terminating substations for the 373 Line."}}
Line 44: Line 45:
 {{ ::de-20-033.pdf |2020, September 9: Order Nisi granting crossing, Rockingham Recreational Trail;  Eversource will transfer 6 existing conductors as well as a static wire to newly constructed support {{ ::de-20-033.pdf |2020, September 9: Order Nisi granting crossing, Rockingham Recreational Trail;  Eversource will transfer 6 existing conductors as well as a static wire to newly constructed support
 structures." }} structures." }}
 +
 +{{ :373:373_2020-08-18_staff_rec.pdf |2020, August 19: staff report on crossing; "The structure will have conductors for the 345 kV 373 transmission line consisting of (6) 850.8 kcmil ACSR 45/7 cables. The static cables will consist of (1) 7#8 Alumoweld cable and (1) 48 Fiber OPGW, which will be vertically attached above the conductors."}}
  
 {{ :373:373_2020-08-18_eversource_supp_replacement_petition.pdf |2020, August 18: supplemental crossing petition (static line changed to OPGW)}} {{ :373:373_2020-08-18_eversource_supp_replacement_petition.pdf |2020, August 18: supplemental crossing petition (static line changed to OPGW)}}
  
 {{ :373:373_2020-08-18_eversource_att_supp_replacement_petition.pdf |2020, August 18: supplemental crossing petition attachments}} {{ :373:373_2020-08-18_eversource_att_supp_replacement_petition.pdf |2020, August 18: supplemental crossing petition attachments}}
- 
-{{ :373:373_2020-08-18_staff_rec.pdf |2020, August 18: staff report on crossing; "The structure will have conductors for the 345 kV 373 transmission line consisting of (6) 850.8 kcmil ACSR 45/7 cables. The static cables will consist of (1) 7#8 Alumoweld cable and (1) 48 Fiber OPGW, which will be vertically attached above the conductors."}} 
  
 {{ :373:391_-_385_-_373_start_of_construction_form.pdf |2020, April 7: Start of construction notification}} {{ :373:391_-_385_-_373_start_of_construction_form.pdf |2020, April 7: Start of construction notification}}
Line 71: Line 72:
 {{ :373:373_385_391_surface_and_groundwater_1-20-2020.pdf |2020, January 1: ground and surface water overlay maps}} {{ :373:373_385_391_surface_and_groundwater_1-20-2020.pdf |2020, January 1: ground and surface water overlay maps}}
  
-{{ :373:373_maybe_2019-08-08_order_26283_summary.pdf |2019, August 8: Order Nisi}}+{{ :373:373_maybe_2019-08-08_order_26283_summary.pdf |2019, August 8: Summary of Order Nisi}}
  
-{{ :373:373_2019-08-06_order_26281_summary.pdf |2019, August 6: Order summary}}+{{ :373:373_2019-08-06_order_26281_summary.pdf |2019, August 6: Summary of Order Nisi}}
  
-{{ :373:373_2019-08-06_order_26281.pdf |2019, August 6: Order}}+{{ :373:373_2019-08-06_order_26281.pdf |2019, August 6: Order Nisi}}
  
 {{ :373:391_-_373_-_385_start_of_construction_form_2019.pdf |2019, July 1:  Start of construction notification}} {{ :373:391_-_373_-_385_start_of_construction_form_2019.pdf |2019, July 1:  Start of construction notification}}