 373 345kV Line 373 345kV Line
  
 +{{ :373:a02_eversource_nh_acr_385_373_391.pdf |2025, June 16: PAC presentation on continued structure replacements on 345k lines 373, 385 and 391. $16 m. total}}
  
-{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}+{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}
  
-{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18presentation to PAC, replace 34 out of 178 structures; $10.3 million}}+{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18presentation to PAC, replace 34 out of 178 structures; $10.3 million}}
  
 {{ :373:2023-02-28-field-inspection-2023224341.pdf |2023, February 28: "The purpose of the [DES] site inspection was in response to concerns about construction practices.: }} {{ :373:2023-02-28-field-inspection-2023224341.pdf |2023, February 28: "The purpose of the [DES] site inspection was in response to concerns about construction practices.: }}
Line 34: Line 35:
 {{ ::de-20-195-order-26-468.pdf |2021, April 7: order granting Lamprey river crossing}} {{ ::de-20-195-order-26-468.pdf |2021, April 7: order granting Lamprey river crossing}}
  
-{{ ::a4_eversource_345kv_structure_replacement_2020_2021.pdf |2021, January 21: presentation to PAC, 22 structures out of 178 replaced, $9.8 m}}+{{ :373:373_012121_pac_minutes_final.pdf |2021, January 21: Minutes of PAC meeting.}}
  
-{{ :373:373_2021.pdf |2021, January 21: Presentation to PAC  }}+{{ ::a4_eversource_345kv_structure_replacement_2020_2021.pdf |2021, January 21: presentation to PAC, 22 structures out of 178 replaced, $9.8 m}}
  
 {{ :373:2020_puc_crossing_373_scobie_pond_to_deerfield_ss_opgw.pdf |2020, December 22: petition to cross Lamprey River; "The proposed project for the 373 Line will complete installation of OPGW communications cable between the Deerfield substation and Scobie Pond substation in Derry. The only other PUC crossing span between those terminating substations, located between Structures 242 to 243 in Raymond, was licensedfor both structure replacement (wood to steel) and OPGW communications cable installation pursuant to Order 26,402 in Docket DE 20-033, so this petition will complete structure replacement and communications functionality reliability upgrades between those terminating substations for the 373 Line."}} {{ :373:2020_puc_crossing_373_scobie_pond_to_deerfield_ss_opgw.pdf |2020, December 22: petition to cross Lamprey River; "The proposed project for the 373 Line will complete installation of OPGW communications cable between the Deerfield substation and Scobie Pond substation in Derry. The only other PUC crossing span between those terminating substations, located between Structures 242 to 243 in Raymond, was licensedfor both structure replacement (wood to steel) and OPGW communications cable installation pursuant to Order 26,402 in Docket DE 20-033, so this petition will complete structure replacement and communications functionality reliability upgrades between those terminating substations for the 373 Line."}}