User Tools

Site Tools


381

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
381 [2023/09/01 02:44] sigridundset381 [2024/06/21 02:27] (current) sigridundset
Line 1: Line 1:
-380 345kV Line+381 345kV
  
-{{ ::380:line_380.jpg?linkonly |original and replacement structures}}+{{ :381:381.png?linkonly |2024, June RSP list: reconductor planned for 2027}}
  
-{{ ::380:380.jpg?linkonly |increased visibility of replacement structures}}+{{ ::pac_381_379_optical_ground_wire_upgrade.pdf |2023, January 9: presentation to PAC}}
  
-{{ ::a05_es_381_379_optical_ground_wire_upgrade.pdf |2023, January 19, presentation to PAC, ground wire replacement}}+{{ :1-cre-2022-025-application.pdf |2022: application for crossing}}
  
-{{ ::380:aot2196_rm.pdf |2022, July 29; DES permit with waivers}}+{{ :2-cre-2022-025-application-exhibits.pdf |2022, application exhibits}}
  
-{{ ::380:cre-2022-005-order-of-notice.pdf |2022, permit granted by DOE}}+{{ ::381_line_survey_fuss_o_neill.png?linkonly |line survey photo}}
  
-{{ ::1-cre-2022-025-application.pdf |2022October 24; application for crossing}}+{{ :381:381_2020-01-22_order_26327_summary.pdf |2020January 22: Order summary}}
  
-{{ ::2-cre-2022-025-application-exhibits.pdf |2022application exhibits}}+{{ ::381_1-22-2020_order.pdf |2020January 22: Order}}
  
-{{ ::3.-cre-2022-005-energy-staff-recommendation.pdf |2022, staff recommendation}}+{{ :381:381_2019-08-29_staff_recommendation.pdf |2019August 29: staff recommendation}}
  
-{{ ::3-cre-2022-025-energy-staff-recommendation.pdf |2022staff recommendation}}+{{ :381:381_2019-05-23_eversource_petition_cross_water_land_winchester.pdf |2019, May 23: petition to cross public water and landWinchester}}
  
-{{ ::cre-2022-005-order-of-notice.pdf |2022order of notice}}+{{ :381:381_2019-05-23_eversource_att_petition_cross_water_land_winchester.pdf |2019, May 23: petition to cross public water and land, Winchesterexhibits}}
  
-{{ ::380_ferc_comments.pdf |2017, May 11Merrimack Town Council Minutes}} +{{ ::381:381_proposed_reliability_upgrade_10-2012.png?linkonly |2012October proposed reliability upgrade}}
- +
-{{ ::a9_eversource_345kv_structure_replacement_projects.pdf |2017December presentation to PAC, replacement of 48 out of 89 poles.}}+
  
  
381.1693550675.txt.gz · Last modified: 2023/09/01 02:44 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki