Line 4: Line 4:
  
 {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}}
 +
 +{{ :373:a02_eversource_nh_acr_385_373_391.pdf |2025, June 16: PAC presentation on continued structure replacements on 345k lines 373, 385 and 391. $16 m. total}}
 +
 +{{ :b112:raarp_forms_-_rtk_request_-_redacted_2_of_4.pdf |2023, July: Reptile and Amphibian sitings, including B-112 and 345kV lines 380 and 326.}}
 +
 +{{ :373:381_395_373_2022-02462_approval.pdf |2022, August 26: DES permit}}
  
 {{ :373:391_-_373_-_385_des_permit_with_waivers_2022.pdf |2022, August 19: DES permit with waivers}} {{ :373:391_-_373_-_385_des_permit_with_waivers_2022.pdf |2022, August 19: DES permit with waivers}}
 +
 +{{ :391:391_2022-02462_pbn.pdf |2022, August 16: notification to DES; replacing 5 structures in Derry}}
  
 {{ :373:375_-_383_-_391_f_g_and_es_discussion.pdf |2022, August 5: F&G and eversource discussion- too bad for Blanding's turtle.}} {{ :373:375_-_383_-_391_f_g_and_es_discussion.pdf |2022, August 5: F&G and eversource discussion- too bad for Blanding's turtle.}}
Line 15: Line 23:
 {{ :373:373_385_391_aot_4-2022.pdf |2022, April Alteration of Terrain plans}} {{ :373:373_385_391_aot_4-2022.pdf |2022, April Alteration of Terrain plans}}
  
-{{ ::de-20-195-order-26-468.pdf |2021, April 7,order granting river crossing}}+{{ ::de-20-195-order-26-468.pdf |2021, April 7,order granting river crossing, Lamprey River; "The Company proposes to replace one of two existing static wires with an optical ground wire (OPGW) cable. The original 
 +wooden structures at the Lamprey River crossing location in Deerfield, Structures 212 and 213, were replaced in 2019.1 Eversource stated that the project proposed in the current petition will complete installation of an OPGW communications cable between the Deerfield substation in Deerfield and Scobie Pond substation in Derry.2"}}
  
 {{ :373:385-_373-_391_natural_heritage_bureau.pdf |2022, May 20: Natural Heritage Bureau}} {{ :373:385-_373-_391_natural_heritage_bureau.pdf |2022, May 20: Natural Heritage Bureau}}
Line 21: Line 30:
 {{ :373:373_385_391_ground_and_surface_water_aot_5-2022.pdf |2022, May: ground and surface water overlay maps}} {{ :373:373_385_391_ground_and_surface_water_aot_5-2022.pdf |2022, May: ground and surface water overlay maps}}
  
-{{ ::20-066_2020-05-04_eversource_petition_crossing_.pdf |2020, May 4: crossing petition}}+{{ ::de-20-034.pdf |2020, September 2: Order re. crossing; "We note that there is no adequate description of the location of the crossing in the petition. The petition relies on a map that has very little detail other than a circle around an area over the river in Strafford. Streets are not identified on the map. But for the work of Staff, comparing the map provided to published maps of the area, we would be unable to describe to the public where the crossing is located, other than that it is in the Town of Strafford. We 
 +expect, and direct, that future petitions will contain a descriptive narrative of where the crossing 
 +is located, so that the crossing can be easily located and the public can be adequately informed."}} 
 + 
 +{{ ::20-066_2020-05-04_eversource_petition_crossing_.pdf |2020, May 4: crossing petition; No conductor, shield wire or neutral shall be added or replaced as part of those structure replacements; instead, existing conductors and wires shall be tran sferred to the new structures. Sougehan River}}
  
 {{ :373:391_-_385_-_373_start_of_construction_form.pdf |2020, April 7: Start of construction notification}} {{ :373:391_-_385_-_373_start_of_construction_form.pdf |2020, April 7: Start of construction notification}}
Line 31: Line 44:
 {{ :373:391_-_385_-_373_des_to_nhb.pdf |2020, March 17: DES to NHB}} {{ :373:391_-_385_-_373_des_to_nhb.pdf |2020, March 17: DES to NHB}}
  
-{{ :373:381_-_395_-_373_aot_application.pdf |2020: January 20: Alteration of Terrain application}}+{{ :373:aot-1781_miscellaneous.pdf |2020, January 20: AoT application, 244 pages}} 
 + 
 +{{ :373:381_-_395_-_373_aot_application.pdf |2020: January 20: AoT application 254 pages}}
  
 {{ :373:373_385_391_surface_and_groundwater_1-20-2020.pdf |2020, January 20: ground and surface water overlay maps}} {{ :373:373_385_391_surface_and_groundwater_1-20-2020.pdf |2020, January 20: ground and surface water overlay maps}}
Line 42: Line 57:
  
 {{ :373:391_373_385_gsurface_and_groundwater_overlay_map_4-24-2019.pdf |2019, April 4: surface and groundwater overlay map}} {{ :373:391_373_385_gsurface_and_groundwater_overlay_map_4-24-2019.pdf |2019, April 4: surface and groundwater overlay map}}
- 
-{{ ::de-20-034.pdf |2020, September 2: petition to cross}} 
  
 {{ :385:aot-1632_start_of_construction.pdf |2019, July 1: start of construction notice}} {{ :385:aot-1632_start_of_construction.pdf |2019, July 1: start of construction notice}}