 391 345kV Line 391 345kV Line
- 
  
  
 {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}}
 +
 +{{ :373:a02_eversource_nh_acr_385_373_391.pdf |2025, June 16: PAC presentation on continued structure replacements on 345k lines 373, 385 and 391. $16 m. total}}
  
 {{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}} {{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}
  
 {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 39 out of 335 structures; $12.4 million}} {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 39 out of 335 structures; $12.4 million}}
 +
 +{{ :391:391_2023-03-07-eversource_to_des.pdf |2023, March 7: E$ to DES; "The gravel fill used within the CMP meets NHDOT 304.4 sieve size standards. For structures in uplands, the exterior of the CMP is padded with either 8” of flowable fill or 10” of NHDOT 304.4 mix. For structures in wetlands, we don’t put any material around the outside of the CMP"}}
 +
 +{{ :391:391_2023-02-28-field-inspection-2023224341.pdf |2023, February 8: DES inspection in response to complaint}}
 +
 +{{ :373:381_395_373_2022-02462_approval.pdf |2022, August 26: DES permit}}
  
 {{ :373:391_-_373_-_385_des_permit_with_waivers_2022.pdf |2022, August 19: DES permit with waivers}} {{ :373:391_-_373_-_385_des_permit_with_waivers_2022.pdf |2022, August 19: DES permit with waivers}}
 +
 +{{ :391:391_2022-02462_pbn.pdf |2022, August 16: notification to DES; replacing 5 structures in Derry}}
 +
 +{{ :391:391_2022-02462_pbn.pdf |2022, August 16: notification to DES; replacing 5 structures in Derry}}
  
 {{ :373:375_-_383_-_391_f_g_and_es_discussion.pdf |2022, August 5: F&G and eversource discussion}} {{ :373:375_-_383_-_391_f_g_and_es_discussion.pdf |2022, August 5: F&G and eversource discussion}}
Line 15: Line 26:
 {{ :a3_eversource_new_hampshire_asset_conditions_wood_structure_replacement.pdf |2022, June 15 presentation to PAC, replace 27 out of 335 poles; $9. million for 391 line}} {{ :a3_eversource_new_hampshire_asset_conditions_wood_structure_replacement.pdf |2022, June 15 presentation to PAC, replace 27 out of 335 poles; $9. million for 391 line}}
  
-{{ :391:aot_2210_miscellaneous_r.pdf |2022, June 1; Alteration of Terrain application 391 line.}}+{{ :391:aot_2210_miscellaneous_r.pdf |2022, June 1; Alteration of Terrain application}}
  
 {{ :373:385-_373-_391_natural_heritage_bureau.pdf |2022, May 20: Natural Heritage Bureau}} {{ :373:385-_373-_391_natural_heritage_bureau.pdf |2022, May 20: Natural Heritage Bureau}}
Line 23: Line 34:
 {{ :373:373_385_391_ground_and_surface_water_aot_5-2022.pdf |2022, May: ground and surface water overlay maps}} {{ :373:373_385_391_ground_and_surface_water_aot_5-2022.pdf |2022, May: ground and surface water overlay maps}}
  
-{{ :373:373_385_391_aot_4-2022.pdf |2022, April Alteration of Terrain drawings, 48 pages}}+{{ :373:373_385_391_aot_4-2022.pdf |2022, AprilAlteration of Terrain drawings, 48 pages}}
  
-{{ :373:385_-_391_-_373_dees_permit_with_waivers.pdf |2020, April 3DES permit with waivers}}+{{ ::de-20-195-order-26-468.pdf |2021, April 7order granting river crossing}}
  
-{{ :391:fig_4_-_391_385_373_2022_aot_plans_041522_compiled.pdf |2022, April, Alteration of Terrain Plans, 391, 373, 385}}+{{ :373:391_-_385_-_373_start_of_construction_form.pdf |2020, April 7: Start of construction notification}}
  
-{{ :373:391_-_385_-_373_des_permit_with_waivers_2020.pdf |2020 DES permit with waivers}} +{{ :373:385_-_391_-_373_dees_permit_with_waivers.pdf |2020, April 3: DES permit with waivers}}
- +
-{{ :373:391_-_385_-_373_start_of_construction_form.pdf |2020, April 7: Start of construction notification}}+
  
 {{ :373:391_-_373_-_385_f_g.pdf |2020, April 2: F&G}} {{ :373:391_-_373_-_385_f_g.pdf |2020, April 2: F&G}}
Line 37: Line 46:
 {{ :373:391_-_385_-_373_des_to_nhb.pdf |2020, March 17: DES to NHB}} {{ :373:391_-_385_-_373_des_to_nhb.pdf |2020, March 17: DES to NHB}}
  
-{{ :373:373_385_391_surface_and_groundwater_1-20-2020.pdf |2020January 1: ground and surface water overlay maps}}+{{ ::delineated_wetland_under_391.jpg?linkonly |delineated wetland under 391"upgrade"}}
  
-{{ :373:381_-_395_-_373_aot_application.pdf |2020: January 20: Alteration of Terrain application}}+{{ ::delineated_wetland_under_391_2_.jpg?linkonly |delineated wetland under 391, wetlands are not an asset, 'for' Eversource.}}
  
-{{ :373:391_-_373_-_385_start_of_construction_form_2019.pdf |2019July 1:  Start of construction notification}}+{{ ::delineated_wetland_under_391_line.jpg?linkonly |delineated wetland under 391"upgrade"}}
  
-{{ :373:391_-_373_-_385_des_permit_with_waivers_6-22-2019.pdf |2019June 22: DES permit with waivers}}+{{ :391:aot1781_rm.pdf |2020April 3; DES permission to Alter the Terrain, with waivers}}
  
-{{ :373:373_385_391_aot_permit_app_5-2019.pdf |2019MayAOT application}}+{{ :373:aot-1781_miscellaneous.pdf |2020January 20AoT application, 244 pages}}
  
-{{ :373:391_373_385_gsurface_and_groundwater_overlay_map_4-24-2019.pdf |2019, April 4 surface and groundwater overlay map}}+{{ :373:381_-_395_-_373_aot_application.pdf |2020: January 20: AoT application 254 pages}}
  
 +{{ :373:373_385_391_surface_and_groundwater_1-20-2020.pdf |2020, January 1: ground and surface water overlay maps}}
  
 +{{ :373:391_-_373_-_385_start_of_construction_form_2019.pdf |2019, July 1:  Start of construction notification}}
  
-{{ ::de-20-195-order-26-468.pdf |2021April 7,order granting river crossing}}+{{ ::391:aot1632_rm.pdf |2019June 28; DES permission to Alter Terrainwith waivers, 391, 373, 385}}
  
 +{{ :373:391_-_373_-_385_des_permit_with_waivers_6-22-2019.pdf |2019, June 22: DES permit with waivers}}
  
 +{{ :391:aot-1632_miscellaneous_r.pdf |2019, May: Alteration of Terrain permit application}}
  
-{{ ::delineated_wetland_under_391.jpg?linkonly |delineated wetland under 391"upgrade"}}+{{ :385:391_2019-04-10_eversource_att_petition_cross_lamprey_river_deerfield.pdf |2019April 10: exhibits for petition to cross Lamprey River, 2-7#8 Alumoweld}}
  
-{{ ::delineated_wetland_under_391_2_.jpg?linkonly |delineated wetland under 391wetlands are not an asset, 'for' Eversource.}}+{{ :385:391_2019-04-10_eversource_petition_cross_lamprey_river_deerfield.pdf |2019April 10: petition to cross Lamprey River}}
  
-{{ ::delineated_wetland_under_391_line.jpg?linkonly |delineated wetland under 391, "upgrade"}} +{{ :373:391_373_385_gsurface_and_groundwater_overlay_map_4-24-2019.pdf |2019, April 4surface and groundwater overlay map}}
- +
-{{ :391:aot-1781_plans.pdf |2020, January 20; Surface and Groundwater overlay plans}} +
- +
-{{ :391:aot-1781_start_of_construction.pdf |2020: Start of Construction form}} +
- +
-{{ :391:aot1781_rm.pdf |2020, April 3; DES permission to Alter the Terrain, with waivers}} +
- +
-{{ :391:aot-1632_start_of_construction.pdf |2019, July 1 Start of Construction form}} +
- +
-{{ ::391:aot1632_rm.pdf |2019, June 28; DES permission to Alter Terrain, with waivers, 391, 373, 385}}+
  
-{{ :391:aot-1632_miscellaneous_r.pdf |2019, May; Alteration of Terrain permit application}}+{{ :391:aot-1632_plans.pdf |2019, April 2:  Alteration of Terrain plans}}
  
-{{ :391:aot-1632_plans.pdf |2019April 24; Alteration of Terrain plans for structure replacements 391373385}}+{{ :373:373_385_391_2018-00123_maintenance_notification.pdf |2018October 28: installation of grounding rings at 30 structures$10,000 paid to DES}}
  
 {{ ::a9_eversource_345kv_structure_replacement_projects.pdf |2017, December presentation to PAC, replacement of 69 out of 335 poles; $19.6 million}} {{ ::a9_eversource_345kv_structure_replacement_projects.pdf |2017, December presentation to PAC, replacement of 69 out of 335 poles; $19.6 million}}