 391 345kV Line 391 345kV Line
- 
  
  
 {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}}
 +
 +{{ :373:a02_eversource_nh_acr_385_373_391.pdf |2025, June 16: PAC presentation on continued structure replacements on 345k lines 373, 385 and 391. $16 m. total}}
  
 {{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}} {{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}
  
 {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 39 out of 335 structures; $12.4 million}} {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 39 out of 335 structures; $12.4 million}}
 +
 +{{ :391:391_2023-03-07-eversource_to_des.pdf |2023, March 7: E$ to DES; "The gravel fill used within the CMP meets NHDOT 304.4 sieve size standards. For structures in uplands, the exterior of the CMP is padded with either 8” of flowable fill or 10” of NHDOT 304.4 mix. For structures in wetlands, we don’t put any material around the outside of the CMP"}}
 +
 +{{ :391:391_2023-02-28-field-inspection-2023224341.pdf |2023, February 8: DES inspection in response to complaint}}
 +
 +{{ :373:381_395_373_2022-02462_approval.pdf |2022, August 26: DES permit}}
  
 {{ :373:391_-_373_-_385_des_permit_with_waivers_2022.pdf |2022, August 19: DES permit with waivers}} {{ :373:391_-_373_-_385_des_permit_with_waivers_2022.pdf |2022, August 19: DES permit with waivers}}
 +
 +{{ :391:391_2022-02462_pbn.pdf |2022, August 16: notification to DES; replacing 5 structures in Derry}}
 +
 +{{ :391:391_2022-02462_pbn.pdf |2022, August 16: notification to DES; replacing 5 structures in Derry}}
  
 {{ :373:375_-_383_-_391_f_g_and_es_discussion.pdf |2022, August 5: F&G and eversource discussion}} {{ :373:375_-_383_-_391_f_g_and_es_discussion.pdf |2022, August 5: F&G and eversource discussion}}
Line 15: Line 26:
 {{ :a3_eversource_new_hampshire_asset_conditions_wood_structure_replacement.pdf |2022, June 15 presentation to PAC, replace 27 out of 335 poles; $9. million for 391 line}} {{ :a3_eversource_new_hampshire_asset_conditions_wood_structure_replacement.pdf |2022, June 15 presentation to PAC, replace 27 out of 335 poles; $9. million for 391 line}}
  
-{{ :391:aot_2210_miscellaneous_r.pdf |2022, June 1; Alteration of Terrain application 391 line.}}+{{ :391:aot_2210_miscellaneous_r.pdf |2022, June 1; Alteration of Terrain application}}
  
 {{ :373:385-_373-_391_natural_heritage_bureau.pdf |2022, May 20: Natural Heritage Bureau}} {{ :373:385-_373-_391_natural_heritage_bureau.pdf |2022, May 20: Natural Heritage Bureau}}
Line 43: Line 54:
 {{ :391:aot1781_rm.pdf |2020, April 3; DES permission to Alter the Terrain, with waivers}} {{ :391:aot1781_rm.pdf |2020, April 3; DES permission to Alter the Terrain, with waivers}}
  
-{{ :373:381_-_395_-_373_aot_application.pdf |2020: January 20: Alteration of Terrain application}}+{{ :373:aot-1781_miscellaneous.pdf |2020, January 20: AoT application, 244 pages}} 
 + 
 +{{ :373:381_-_395_-_373_aot_application.pdf |2020: January 20: AoT application 254 pages}}
  
 {{ :373:373_385_391_surface_and_groundwater_1-20-2020.pdf |2020, January 1: ground and surface water overlay maps}} {{ :373:373_385_391_surface_and_groundwater_1-20-2020.pdf |2020, January 1: ground and surface water overlay maps}}
Line 54: Line 67:
  
 {{ :391:aot-1632_miscellaneous_r.pdf |2019, May: Alteration of Terrain permit application}} {{ :391:aot-1632_miscellaneous_r.pdf |2019, May: Alteration of Terrain permit application}}
 +
 +{{ :385:391_2019-04-10_eversource_att_petition_cross_lamprey_river_deerfield.pdf |2019, April 10: exhibits for petition to cross Lamprey River, 2-7#8 Alumoweld}}
 +
 +{{ :385:391_2019-04-10_eversource_petition_cross_lamprey_river_deerfield.pdf |2019, April 10: petition to cross Lamprey River}}
  
 {{ :373:391_373_385_gsurface_and_groundwater_overlay_map_4-24-2019.pdf |2019, April 4: surface and groundwater overlay map}} {{ :373:391_373_385_gsurface_and_groundwater_overlay_map_4-24-2019.pdf |2019, April 4: surface and groundwater overlay map}}
  
 {{ :391:aot-1632_plans.pdf |2019, April 2:  Alteration of Terrain plans}} {{ :391:aot-1632_plans.pdf |2019, April 2:  Alteration of Terrain plans}}
 +
 +{{ :373:373_385_391_2018-00123_maintenance_notification.pdf |2018, October 28: installation of grounding rings at 30 structures, $10,000 paid to DES}}
  
 {{ ::a9_eversource_345kv_structure_replacement_projects.pdf |2017, December presentation to PAC, replacement of 69 out of 335 poles; $19.6 million}} {{ ::a9_eversource_345kv_structure_replacement_projects.pdf |2017, December presentation to PAC, replacement of 69 out of 335 poles; $19.6 million}}