Both sides previous revisionPrevious revisionNext revision | Previous revision |
391 [2024/02/22 04:49] – sigridundset | 391 [2025/06/15 04:15] (current) – sigridundset |
---|
391 345kV Line | 391 345kV Line |
| |
| |
| |
{{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} | {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} |
| |
| {{ :373:a02_eversource_nh_acr_385_373_391.pdf |2025, June 16: PAC presentation on continued structure replacements on 345k lines 373, 385 and 391. $16 m. total}} |
| |
{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}} | {{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}} |
| |
{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 39 out of 335 structures; $12.4 million}} | {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 39 out of 335 structures; $12.4 million}} |
| |
| {{ :391:391_2023-03-07-eversource_to_des.pdf |2023, March 7: E$ to DES; "The gravel fill used within the CMP meets NHDOT 304.4 sieve size standards. For structures in uplands, the exterior of the CMP is padded with either 8” of flowable fill or 10” of NHDOT 304.4 mix. For structures in wetlands, we don’t put any material around the outside of the CMP"}} |
| |
{{ :391:391_2023-02-28-field-inspection-2023224341.pdf |2023, February 8: DES inspection in response to complaint}} | {{ :391:391_2023-02-28-field-inspection-2023224341.pdf |2023, February 8: DES inspection in response to complaint}} |
{{ :373:391_-_373_-_385_des_permit_with_waivers_2022.pdf |2022, August 19: DES permit with waivers}} | {{ :373:391_-_373_-_385_des_permit_with_waivers_2022.pdf |2022, August 19: DES permit with waivers}} |
| |
{{ :391:391_2023-03-07-eversource_to_des.pdf |}} | {{ :391:391_2022-02462_pbn.pdf |2022, August 16: notification to DES; replacing 5 structures in Derry}} |
| |
{{ :391:391_2022-02462_pbn.pdf |2022, August 16: notification to DES; replacing 5 structures in Derry}} | {{ :391:391_2022-02462_pbn.pdf |2022, August 16: notification to DES; replacing 5 structures in Derry}} |
{{ :391:aot1781_rm.pdf |2020, April 3; DES permission to Alter the Terrain, with waivers}} | {{ :391:aot1781_rm.pdf |2020, April 3; DES permission to Alter the Terrain, with waivers}} |
| |
{{ :373:381_-_395_-_373_aot_application.pdf |2020: January 20: Alteration of Terrain application}} | {{ :373:aot-1781_miscellaneous.pdf |2020, January 20: AoT application, 244 pages}} |
| |
| {{ :373:381_-_395_-_373_aot_application.pdf |2020: January 20: AoT application 254 pages}} |
| |
{{ :373:373_385_391_surface_and_groundwater_1-20-2020.pdf |2020, January 1: ground and surface water overlay maps}} | {{ :373:373_385_391_surface_and_groundwater_1-20-2020.pdf |2020, January 1: ground and surface water overlay maps}} |
| |
{{ :391:aot-1632_miscellaneous_r.pdf |2019, May: Alteration of Terrain permit application}} | {{ :391:aot-1632_miscellaneous_r.pdf |2019, May: Alteration of Terrain permit application}} |
| |
| {{ :385:391_2019-04-10_eversource_att_petition_cross_lamprey_river_deerfield.pdf |2019, April 10: exhibits for petition to cross Lamprey River, 2-7#8 Alumoweld}} |
| |
| {{ :385:391_2019-04-10_eversource_petition_cross_lamprey_river_deerfield.pdf |2019, April 10: petition to cross Lamprey River}} |
| |
{{ :373:391_373_385_gsurface_and_groundwater_overlay_map_4-24-2019.pdf |2019, April 4: surface and groundwater overlay map}} | {{ :373:391_373_385_gsurface_and_groundwater_overlay_map_4-24-2019.pdf |2019, April 4: surface and groundwater overlay map}} |