Both sides previous revisionPrevious revisionNext revision | Previous revision |
391 [2024/02/22 04:52] – sigridundset | 391 [2025/06/15 04:15] (current) – sigridundset |
---|
391 345kV Line | 391 345kV Line |
| |
| |
| |
{{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} | {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} |
| |
| {{ :373:a02_eversource_nh_acr_385_373_391.pdf |2025, June 16: PAC presentation on continued structure replacements on 345k lines 373, 385 and 391. $16 m. total}} |
| |
{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}} | {{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}} |
{{ :391:aot1781_rm.pdf |2020, April 3; DES permission to Alter the Terrain, with waivers}} | {{ :391:aot1781_rm.pdf |2020, April 3; DES permission to Alter the Terrain, with waivers}} |
| |
{{ :373:381_-_395_-_373_aot_application.pdf |2020: January 20: Alteration of Terrain application}} | {{ :373:aot-1781_miscellaneous.pdf |2020, January 20: AoT application, 244 pages}} |
| |
| {{ :373:381_-_395_-_373_aot_application.pdf |2020: January 20: AoT application 254 pages}} |
| |
{{ :373:373_385_391_surface_and_groundwater_1-20-2020.pdf |2020, January 1: ground and surface water overlay maps}} | {{ :373:373_385_391_surface_and_groundwater_1-20-2020.pdf |2020, January 1: ground and surface water overlay maps}} |
| |
{{ :391:aot-1632_miscellaneous_r.pdf |2019, May: Alteration of Terrain permit application}} | {{ :391:aot-1632_miscellaneous_r.pdf |2019, May: Alteration of Terrain permit application}} |
| |
| {{ :385:391_2019-04-10_eversource_att_petition_cross_lamprey_river_deerfield.pdf |2019, April 10: exhibits for petition to cross Lamprey River, 2-7#8 Alumoweld}} |
| |
| {{ :385:391_2019-04-10_eversource_petition_cross_lamprey_river_deerfield.pdf |2019, April 10: petition to cross Lamprey River}} |
| |
{{ :373:391_373_385_gsurface_and_groundwater_overlay_map_4-24-2019.pdf |2019, April 4: surface and groundwater overlay map}} | {{ :373:391_373_385_gsurface_and_groundwater_overlay_map_4-24-2019.pdf |2019, April 4: surface and groundwater overlay map}} |