a-111 [2024/04/08 03:50] sigridundseta-111 [2024/04/08 04:43] (current) sigridundset
Line 10: Line 10:
 {{ ::a111:a111_start_of_construction_.pdf |2022: Start of Construction notice}} {{ ::a111:a111_start_of_construction_.pdf |2022: Start of Construction notice}}
  
-{{ ::license-granted.pdf |2022, January 21: DOE crossing permit}}+{{ ::license-granted.pdf |2022, January 21: DOE crossing permit; six crossings}}
  
-{{ ::crossing_license.pdf |2021, October 21: crossing license for nine structure replacement, reconductoring and OPGW}} +{{ ::crossing_license.pdf |2021, October 21: crossing license for nine structure replacement, reconductoring and OPGW, William H. Thomas State Forest and Pemigewasset River in Hill and Hampton}}
- +
-{{ ::cr-2021-016-order-of-notice.pdf |2021October 5: license for crossing of William Thomas state forest and Pemigewasset River in Hill and New Hampton}}+
  
 +{{ ::cr-2021-016-order-of-notice.pdf |2021, October 5: Order Nisi for crossing of William Thomas state forest and Pemigewasset River in Hill and New Hampton}}
  
 {{ ::a111:a111_des_permission_with_waiver_9-3-2021.pdf |2021, September 3: DES permit with waivers}} {{ ::a111:a111_des_permission_with_waiver_9-3-2021.pdf |2021, September 3: DES permit with waivers}}
Line 26: Line 25:
  
 {{ ::iso_7-15-2021_no_significant_impact_of_interconnection.pdf |2021, July 15: ISO determination of no problems with interconnection}} {{ ::iso_7-15-2021_no_significant_impact_of_interconnection.pdf |2021, July 15: ISO determination of no problems with interconnection}}
- 
  
 {{ ::staff_recommend.pdf |2021, June 25: staff recommendation; nine wood structures replaced with steel, existing conductors will be replaced with (3) new ACSS 1272 54/19 kcmil conductors. Two existing shield wires will be replaced with (2) 48 fiber optical ground wire (OPGW) }} {{ ::staff_recommend.pdf |2021, June 25: staff recommendation; nine wood structures replaced with steel, existing conductors will be replaced with (3) new ACSS 1272 54/19 kcmil conductors. Two existing shield wires will be replaced with (2) 48 fiber optical ground wire (OPGW) }}
 +
 +{{ :a111:a-111_2021-06-25_staff_rec.pdf |2021, June 21: staff recommendation}}
 +
 +{{ :a111:a-111_2021-06-02_eversource_petition_crossing.pdf |2021, June 6: petition for crossing the Pemigewasset River in Hill and New Hampton, and William H.Thomas State Forest: "The proposed project for the A111 encompasses a full line rebuild."}}
 +
 +{{ :a111:a-111_2021-06-02_eversource_att_petition_crossing.pdf |2021, June 2: petition for crossing; exhibits: two 48 fiber .646 OPGW, steel structures, 1272 ACSS 54/7 conductor}}
  
 {{ :a111:a-111_des_permit.pdf |2021, May 26: AoT application and DES permit with waivers}} {{ :a111:a-111_des_permit.pdf |2021, May 26: AoT application and DES permit with waivers}}
Line 36: Line 40:
 {{ ::a111_full_rebuild_.pdf |2021, April 8: Submission to SEC claiming new, larger, taller, steel line is a one-for-one replacement}} {{ ::a111_full_rebuild_.pdf |2021, April 8: Submission to SEC claiming new, larger, taller, steel line is a one-for-one replacement}}
  
-{{ :a111:a-111_2020-10-22_staff_rec_rev.pdf |2020, October 22, staff recommendation}} +{{ :a111:a-111_1537_2021-0906.pdf |2021March 9inspection permit DES}}
- +
-{{ :a111:a-111_2020-09-04_staff_rec.pdf |2020September 4staff recommendation}}+
  
 {{ :a111:a-111_2020-11-12_order_26423.pdf |2020, November 12: license for crossing}} {{ :a111:a-111_2020-11-12_order_26423.pdf |2020, November 12: license for crossing}}
  
-{{ :a111:a-111_2020-03-31_eversource_petition_crossing.pdf |2020, March 31: petition to cross Pemigewasset River in Hill and New Hampton}}+{{ :a111:a-111_2020-10-22_staff_rec_rev.pdf |2020, October 22, revised staff recommendation; '“This crossing was previously licensed by the PUC pursuant to Order 12,219 in Docket # DE 76-22 issued March 12, 1976.” should have read “This crossing was previously licensed by the PUC pursuant to Order 12,219 in Docket # DE 76-22 issued April 21, 1976."}}
  
-{{ :a111:a-111_2020-03-31_eversource_att_petition_crossing.pdf |2020, March 31Pemigewasset River crossing petition exhibits, 336.4 ASCR 26/7, 7#8 alumoweld static lines, 85' and 95' structures, 37.4' clearance}}+{{ :a111:a-111_2020-10-16_eversource_supp_petition.pdf |2020, October 16supplemental petition with 1976 crossing date corrected}}
  
-{{ :a111:a-111_1537_2021-0906.pdf |2021, March 9inspection permit DES}}+{{ :a111:a-111_2020-09-04_staff_rec.pdf |2020, September 4: staff recommendation;  ES’s existing A111 line is not being relocated as result of this project using the existing conductors. The existing wood structure # 79 is being replaced with (3) steel pole structures due to age and environmental damage.}} 
 + 
 +{{ :a111:a-111_2020-03-31_eversource_petition_crossing.pdf |2020, March 31petition to cross Pemigewasset River in Hill and New Hampton, red cedar structure 79 requires immediate replacement, steel, no conductor or ground wire changes}} 
 + 
 +{{ :a111:a-111_2020-03-31_eversource_att_petition_crossing.pdf |2020, March 31: Pemigewasset River crossing petition exhibits, 336.4 ASCR 26/7, 7#8 alumoweld static lines, 85' and 95' structures, 37.4' clearance}}
  
 {{ ::a5_webster_beebe_river_115kv_corridor_asset-conditions_and_opgw_project_lines_a111_e115_z180_rev1_clean.pdf |December 2020 Asset Condition PAC presentation}} {{ ::a5_webster_beebe_river_115kv_corridor_asset-conditions_and_opgw_project_lines_a111_e115_z180_rev1_clean.pdf |December 2020 Asset Condition PAC presentation}}
a-111.1712562658.txt.gz · Last modified: 2024/04/08 03:50 by sigridundset