User Tools

Site Tools


a-111

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
a-111 [2024/04/08 04:03] sigridundseta-111 [2024/10/07 23:23] (current) sigridundset
Line 1: Line 1:
 ====== A-111 115kV transmission line ====== ====== A-111 115kV transmission line ======
  
 +
 +{{ :a111:es_webster_beebe_river_tca_determination.pdf |2023, May 31: ISO approval of Transmission Cost Allocation}}
  
 {{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March 14: NEPOOL approval of $100 m.+ for A-111 , E-115 and Z-180 for Transmission Cost Allowance}} {{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March 14: NEPOOL approval of $100 m.+ for A-111 , E-115 and Z-180 for Transmission Cost Allowance}}
Line 10: Line 12:
 {{ ::a111:a111_start_of_construction_.pdf |2022: Start of Construction notice}} {{ ::a111:a111_start_of_construction_.pdf |2022: Start of Construction notice}}
  
-{{ ::license-granted.pdf |2022, January 21: DOE crossing permit}}+{{ ::license-granted.pdf |2022, January 21: DOE crossing permit; six crossings}}
  
-{{ ::crossing_license.pdf |2021, October 21: crossing license for nine structure replacement, reconductoring and OPGW}} +{{ ::crossing_license.pdf |2021, October 21: crossing license for nine structure replacement, reconductoring and OPGW, William H. Thomas State Forest and Pemigewasset River in Hill and Hampton}}
- +
-{{ ::cr-2021-016-order-of-notice.pdf |2021October 5: license for crossing of William Thomas state forest and Pemigewasset River in Hill and New Hampton}}+
  
 +{{ ::cr-2021-016-order-of-notice.pdf |2021, October 5: Order Nisi for crossing of William Thomas state forest and Pemigewasset River in Hill and New Hampton}}
  
 {{ ::a111:a111_des_permission_with_waiver_9-3-2021.pdf |2021, September 3: DES permit with waivers}} {{ ::a111:a111_des_permission_with_waiver_9-3-2021.pdf |2021, September 3: DES permit with waivers}}
Line 25: Line 26:
 {{ ::a111-project-construction-factsheet.pdf |2021, July: Project construction fact sheet citing reliability}} {{ ::a111-project-construction-factsheet.pdf |2021, July: Project construction fact sheet citing reliability}}
  
-{{ ::iso_7-15-2021_no_significant_impact_of_interconnection.pdf |2021, July 15ISO determination of no problems with interconnection}}+{{ :a111:2021-07-23_response_comment_francis.pdf |2021, July 23email from SEC chair to easement encumbered landowner with dead link to SEC document}}
  
 +{{ :a111:minutes-public-meeting-072121.pdf |2021, July 21: Minutes of SEC meeting where A-111 rebuild was determined not to be a sizeable change}}
 +
 +{{ ::iso_7-15-2021_no_significant_impact_of_interconnection.pdf |2021, July 15: ISO determination of no problems with interconnection}}
  
 {{ ::staff_recommend.pdf |2021, June 25: staff recommendation; nine wood structures replaced with steel, existing conductors will be replaced with (3) new ACSS 1272 54/19 kcmil conductors. Two existing shield wires will be replaced with (2) 48 fiber optical ground wire (OPGW) }} {{ ::staff_recommend.pdf |2021, June 25: staff recommendation; nine wood structures replaced with steel, existing conductors will be replaced with (3) new ACSS 1272 54/19 kcmil conductors. Two existing shield wires will be replaced with (2) 48 fiber optical ground wire (OPGW) }}
 +
 +{{ :a111:a-111_2021-06-25_staff_rec.pdf |2021, June 21: staff recommendation}}
 +
 +{{ :a111:a-111_2021-06-02_eversource_petition_crossing.pdf |2021, June 6: petition for crossing the Pemigewasset River in Hill and New Hampton, and William H.Thomas State Forest: "The proposed project for the A111 encompasses a full line rebuild."}}
 +
 +{{ :a111:a-111_2021-06-02_eversource_att_petition_crossing.pdf |2021, June 2: petition for crossing; exhibits: two 48 fiber .646 OPGW, steel structures, 1272 ACSS 54/7 conductor}}
 +
 +{{ :a111:2021-05-28_eversource_brief_upcoming_maintenance_a111.pdf |2021, May 28: Eversource "brief" to SEC on "upcoming maintenance" (complete rebuild) of A-111 line}}
  
 {{ :a111:a-111_des_permit.pdf |2021, May 26: AoT application and DES permit with waivers}} {{ :a111:a-111_des_permit.pdf |2021, May 26: AoT application and DES permit with waivers}}
 +
 +{{ :a111:draft_minutes_5-24-21_public_mtg.pdf |2021, May 24: Draft minutes of SEC public meeting re. A-111}}
  
 {{ ::a111:a111_nhb_report.pdf |2021, May 19: NHB report}} {{ ::a111:a111_nhb_report.pdf |2021, May 19: NHB report}}
  
-{{ ::a111_full_rebuild_.pdf |2021, April 8: Submission to SEC claiming new, larger, taller, steel line is one-for-one replacement}}+{{ :a111:2021-04-16_sec_response_eversource_notice_transmission_line_maintenance_a111.pdf |2021. April 16: SEC response to Eversource submission.}} 
 + 
 +{{ ::a111_full_rebuild_.pdf |2021, April 8: Submission to SEC in which Erik Newman states: "The project was presented to ISO New England at the December 2020 ISO Planning Advisory Committee (PAC) meeting where it was also approved by ISO at the same meeting"}} 
 + 
 +{{ :a111:a-111_1537_2021-0906.pdf |2021, March 9: inspection permit DES}} 
 + 
 +{{ :a111:121620_pac_meeting_minutes_final.pdf |2020, December 16: Minutes of PAC presentation meeting}}
  
 {{ :a111:a-111_2020-11-12_order_26423.pdf |2020, November 12: license for crossing}} {{ :a111:a-111_2020-11-12_order_26423.pdf |2020, November 12: license for crossing}}
  
 {{ :a111:a-111_2020-10-22_staff_rec_rev.pdf |2020, October 22, revised staff recommendation; '“This crossing was previously licensed by the PUC pursuant to Order 12,219 in Docket # DE 76-22 issued March 12, 1976.” should have read “This crossing was previously licensed by the PUC pursuant to Order 12,219 in Docket # DE 76-22 issued April 21, 1976."}} {{ :a111:a-111_2020-10-22_staff_rec_rev.pdf |2020, October 22, revised staff recommendation; '“This crossing was previously licensed by the PUC pursuant to Order 12,219 in Docket # DE 76-22 issued March 12, 1976.” should have read “This crossing was previously licensed by the PUC pursuant to Order 12,219 in Docket # DE 76-22 issued April 21, 1976."}}
 +
 +{{ :a111:a-111_2020-10-16_eversource_supp_petition.pdf |2020, October 16: supplemental petition with 1976 crossing date corrected}}
  
 {{ :a111:a-111_2020-09-04_staff_rec.pdf |2020, September 4: staff recommendation;  ES’s existing A111 line is not being relocated as result of this project using the existing conductors. The existing wood structure # 79 is being replaced with (3) steel pole structures due to age and environmental damage.}} {{ :a111:a-111_2020-09-04_staff_rec.pdf |2020, September 4: staff recommendation;  ES’s existing A111 line is not being relocated as result of this project using the existing conductors. The existing wood structure # 79 is being replaced with (3) steel pole structures due to age and environmental damage.}}
Line 45: Line 67:
  
 {{ :a111:a-111_2020-03-31_eversource_att_petition_crossing.pdf |2020, March 31: Pemigewasset River crossing petition exhibits, 336.4 ASCR 26/7, 7#8 alumoweld static lines, 85' and 95' structures, 37.4' clearance}} {{ :a111:a-111_2020-03-31_eversource_att_petition_crossing.pdf |2020, March 31: Pemigewasset River crossing petition exhibits, 336.4 ASCR 26/7, 7#8 alumoweld static lines, 85' and 95' structures, 37.4' clearance}}
- 
-{{ :a111:a-111_1537_2021-0906.pdf |2021, March 9: inspection permit DES}} 
  
 {{ ::a5_webster_beebe_river_115kv_corridor_asset-conditions_and_opgw_project_lines_a111_e115_z180_rev1_clean.pdf |December 2020 Asset Condition PAC presentation}} {{ ::a5_webster_beebe_river_115kv_corridor_asset-conditions_and_opgw_project_lines_a111_e115_z180_rev1_clean.pdf |December 2020 Asset Condition PAC presentation}}
a-111.1712563390.txt.gz · Last modified: 2024/04/08 04:03 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki