{{ ::a111-project-construction-factsheet.pdf |2021, July: Project construction fact sheet citing reliability}} | {{ ::a111-project-construction-factsheet.pdf |2021, July: Project construction fact sheet citing reliability}} |
| |
| {{ :a111:2021-07-23_response_comment_francis.pdf |2021, July 23: email from SEC chair to easement encumbered landowner with dead link to SEC document}} |
| |
| {{ :a111:minutes-public-meeting-072121.pdf |2021, July 21: Minutes of SEC meeting where A-111 rebuild was determined not to be a sizeable change}} |
| |
{{ ::iso_7-15-2021_no_significant_impact_of_interconnection.pdf |2021, July 15: ISO determination of no problems with interconnection}} | {{ ::iso_7-15-2021_no_significant_impact_of_interconnection.pdf |2021, July 15: ISO determination of no problems with interconnection}} |
| |
{{ :a111:a-111_2021-06-02_eversource_att_petition_crossing.pdf |2021, June 2: petition for crossing; exhibits: two 48 fiber .646 OPGW, steel structures, 1272 ACSS 54/7 conductor}} | {{ :a111:a-111_2021-06-02_eversource_att_petition_crossing.pdf |2021, June 2: petition for crossing; exhibits: two 48 fiber .646 OPGW, steel structures, 1272 ACSS 54/7 conductor}} |
| |
| {{ :a111:2021-05-28_eversource_brief_upcoming_maintenance_a111.pdf |2021, May 28: Eversource "brief" to SEC on "upcoming maintenance" (complete rebuild) of A-111 line}} |
| |
{{ :a111:a-111_des_permit.pdf |2021, May 26: AoT application and DES permit with waivers}} | {{ :a111:a-111_des_permit.pdf |2021, May 26: AoT application and DES permit with waivers}} |
| |
| {{ :a111:draft_minutes_5-24-21_public_mtg.pdf |2021, May 24: Draft minutes of SEC public meeting re. A-111}} |
| |
{{ ::a111:a111_nhb_report.pdf |2021, May 19: NHB report}} | {{ ::a111:a111_nhb_report.pdf |2021, May 19: NHB report}} |
| |
{{ ::a111_full_rebuild_.pdf |2021, April 8: Submission to SEC claiming new, larger, taller, steel line is a one-for-one replacement}} | {{ :a111:2021-04-16_sec_response_eversource_notice_transmission_line_maintenance_a111.pdf |2021. April 16: SEC response to Eversource submission.}} |
| |
| {{ ::a111_full_rebuild_.pdf |2021, April 8: Submission to SEC in which Erik Newman states: "The project was presented to ISO New England at the December 2020 ISO Planning Advisory Committee (PAC) meeting where it was also approved by ISO at the same meeting"}} |
| |
{{ :a111:a-111_1537_2021-0906.pdf |2021, March 9: inspection permit DES}} | {{ :a111:a-111_1537_2021-0906.pdf |2021, March 9: inspection permit DES}} |