User Tools

Site Tools


a-126

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
a-126 [2024/04/14 05:14] sigridundseta-126 [2024/04/18 03:23] (current) sigridundset
Line 56: Line 56:
 {{ :a126:a-126_2019-05-14_eversource_att_petition_cross_squamscott_stratham_exeter.pdf |2019, May 14: exhibits for crossing, Squampscot River, three 477 ASCR 26/7 Hawk conductors, two Alumoweld 7#8 static ground wires}} {{ :a126:a-126_2019-05-14_eversource_att_petition_cross_squamscott_stratham_exeter.pdf |2019, May 14: exhibits for crossing, Squampscot River, three 477 ASCR 26/7 Hawk conductors, two Alumoweld 7#8 static ground wires}}
  
-{{ :a126:a-126_2019-01-07_eversource_petition_crossing_brentwood.pdf |2019, January 7: crossing petition, Dudley Brook, Brentwood"The existing A126 Line and H141 Line structures are approximately 50 years old and require replacement for these transmission lines to continue to function safely and reliably. This structure replacement and repair project is part of a maintenance project necessary for the A126 and H141 Transmission Lines to continue to meet current as well as future projected electricity demands."}}+{{ :a126:a-126_2019-01-07_eversource_petition_crossing_brentwood.pdf |2019, January 7: crossing petition, Dudley Brook, Brentwood"The existing A126 Line and H141 Line structures are approximately 50 years old and require replacement for these transmission lines to continue to function safely and reliably. This structure replacement and repair project is part of a maintenance project necessary for the A126 and H141 Transmission Lines to continue to meet current as well as future projected electricity demands."}}
  
 {{ ::oct_17_2018_seven_115kv_asset_conditions_lines_partial.pdf |2018, October 17, presentation to PAC, replace 49 structures, $8.3 million}} {{ ::oct_17_2018_seven_115kv_asset_conditions_lines_partial.pdf |2018, October 17, presentation to PAC, replace 49 structures, $8.3 million}}
  
 +{{ :a126:a-126_2020-02-05_order_26330_summary.pdf |2020, February 5: Swamscott River order summary}}
  
 +{{ :a126:a-126_2020-02-05_order_26330.pdf |2020, February 5: order Nisi}}
  
 +{{ :a126:a-126_2019-08-29_staff_recommendation.pdf |2019, August 29: staff recommendation Swamscott River crossing}}
  
 +{{ :a126:2018-10-17_pac.pdf |2018, October 17: presentation to PAC, replace 49 structures for $8.3 m.}}
a-126.1713086070.txt.gz · Last modified: 2024/04/14 05:14 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki