User Tools

Site Tools


asset_condition_process_legitimization_guide

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
asset_condition_process_legitimization_guide [2024/10/24 01:21] sigridundsetasset_condition_process_legitimization_guide [2024/10/24 01:26] (current) sigridundset
Line 38: Line 38:
  
  
 +{{ :ac:ct_occ_acpg_feedback.pdf |2024, June 5: CT Comments on “Joint New England Transmission Owner Asset Condition Process Guide"}}
 +
 +{{ :ac:line_vision_acpg_feedback.pdf |2024, June 5: Line Vision questions on Draft Asset Condition Guide}}
 +
 +{{ :ac:ma_ago_acpg_feedback.pdf |2024, June 5: MA AG feedback on the Draft Joint New England Transmission Owner Asset Condition Process Guide. "While we do not address the substance here, we note that, on May 13, 2024, the Federal Energy Regulatory Commission issued Order No. 1920, which establishes requirements with respect to transmission planning and cost allocation, including local transmission planning inputs in the
 +regional transmission planning process. " }}
 +
 +{{ :ac:nescoe_acpg_feedback.pdf |2024, June 5: NESCOE feedback on Draft Joint NETO Asset Condition Process Guide: "Since NESCOE first asked the NETOs to improve their asset condition processes in early 2023, the NETOs have brought $3.3 billion in asset condition projects through the Planning Advisory Committee (PAC)."}}
 +
 +{{ :ac:2024_04_25_pac_asset_condition_process_guide_draft.pdf |2024, April 25: Asset Condition Process Guide Draft}}
 +
 +{{ :ac:comments_on_4-2024_neto_asset_condition_process_guide.pdf |2024, April 4: k pastoriza comments on NETO Asset Condition Process Guide}}
  
asset_condition_process_legitimization_guide.1729747273.txt.gz · Last modified: 2024/10/24 01:21 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki