User Tools

Site Tools


asset_condition_process_legitimization_guide

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
asset_condition_process_legitimization_guide [2024/10/24 01:24] sigridundsetasset_condition_process_legitimization_guide [2024/10/24 01:26] (current) sigridundset
Line 46: Line 46:
  
 {{ :ac:nescoe_acpg_feedback.pdf |2024, June 5: NESCOE feedback on Draft Joint NETO Asset Condition Process Guide: "Since NESCOE first asked the NETOs to improve their asset condition processes in early 2023, the NETOs have brought $3.3 billion in asset condition projects through the Planning Advisory Committee (PAC)."}} {{ :ac:nescoe_acpg_feedback.pdf |2024, June 5: NESCOE feedback on Draft Joint NETO Asset Condition Process Guide: "Since NESCOE first asked the NETOs to improve their asset condition processes in early 2023, the NETOs have brought $3.3 billion in asset condition projects through the Planning Advisory Committee (PAC)."}}
- 
  
 {{ :ac:2024_04_25_pac_asset_condition_process_guide_draft.pdf |2024, April 25: Asset Condition Process Guide Draft}} {{ :ac:2024_04_25_pac_asset_condition_process_guide_draft.pdf |2024, April 25: Asset Condition Process Guide Draft}}
 +
 +{{ :ac:comments_on_4-2024_neto_asset_condition_process_guide.pdf |2024, April 4: k pastoriza comments on NETO Asset Condition Process Guide}}
  
asset_condition_process_legitimization_guide.1729747465.txt.gz · Last modified: 2024/10/24 01:24 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki