Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |
asset_condition_process_legitimization_guide [2024/10/24 01:24] – sigridundset | asset_condition_process_legitimization_guide [2024/10/24 01:26] (current) – sigridundset |
---|
| |
{{ :ac:nescoe_acpg_feedback.pdf |2024, June 5: NESCOE feedback on Draft Joint NETO Asset Condition Process Guide: "Since NESCOE first asked the NETOs to improve their asset condition processes in early 2023, the NETOs have brought $3.3 billion in asset condition projects through the Planning Advisory Committee (PAC)."}} | {{ :ac:nescoe_acpg_feedback.pdf |2024, June 5: NESCOE feedback on Draft Joint NETO Asset Condition Process Guide: "Since NESCOE first asked the NETOs to improve their asset condition processes in early 2023, the NETOs have brought $3.3 billion in asset condition projects through the Planning Advisory Committee (PAC)."}} |
| |
| |
{{ :ac:2024_04_25_pac_asset_condition_process_guide_draft.pdf |2024, April 25: Asset Condition Process Guide Draft}} | {{ :ac:2024_04_25_pac_asset_condition_process_guide_draft.pdf |2024, April 25: Asset Condition Process Guide Draft}} |
| |
| {{ :ac:comments_on_4-2024_neto_asset_condition_process_guide.pdf |2024, April 4: k pastoriza comments on NETO Asset Condition Process Guide}} |
| |