b-143 [2023/10/18 04:42] sigridundsetb-143 [2024/04/24 02:43] (current) sigridundset
Line 1: Line 1:
 B-143 115kV line B-143 115kV line
  
 +
 +{{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}}
 +
 +{{ :b-143:b-143_2023-018-application-.pdf |2023, August 23: petition to cross; "Replacement structures will be weathering steel equivalents that will be located within 10’ of the existing structure location. The B143’s existing two static wires at all of the crossing locations that are the subject of this application will also be replaced with two optical ground wire (OPGW), whose specifications are identified on Exhibit 2
 +through 4."}}
 +
 +{{ :b-143:b-143_-2023-018-application-exhibits.pdf |2023, petition to cross, exhibits, Baboosic Brook}}
  
 {{ ::c196:aot2413_rm.pdf |2023, June 28: DES permit with waivers grantee}} {{ ::c196:aot2413_rm.pdf |2023, June 28: DES permit with waivers grantee}}
Line 8: Line 15:
 {{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}} {{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}
  
-{{ ::a2_eversourcce_115kv_wood_pole_and_shield_wire_replacements_2020_2023_rev1_redline.pdf |December 2019, 2020-2023 revisions PAC presentation}}+{{ ::a2_eversourcce_115kv_wood_pole_and_shield_wire_replacements_2020_2023_rev1_redline.pdf |2020-2023 revisions PAC presentation}}
  
 {{ ::a2_eversourcce_115kv_wood_pole_and_shield_wire_replacements_2020_2023_rev1_clean.pdf |Same as above but "clean"}} {{ ::a2_eversourcce_115kv_wood_pole_and_shield_wire_replacements_2020_2023_rev1_clean.pdf |Same as above but "clean"}}
  
 {{ ::b143:prlac_5_16_23_minutes_june_agenda.pdf |2023, May 16, PRLAC minutes}} {{ ::b143:prlac_5_16_23_minutes_june_agenda.pdf |2023, May 16, PRLAC minutes}}
 +
 +{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 46 out of 154 structures and reconductor with Optical Ground Wire (OPGW); $17.3 million}}
  
 {{ ::b-143:aot-2413_permit_application_package_r.pdf |2023: May 3: Alteration of Terrain application}} {{ ::b-143:aot-2413_permit_application_package_r.pdf |2023: May 3: Alteration of Terrain application}}
  
-{{ ::b143:prlac_5_16_23_minutes_june_agenda.pdf |2023May 16, PRLAC minutes}}+{{ :b143:b-146_019-12-19_order_26317_summary.pdf |2019December 19: Order summary}}
  
-{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023May 18, presentation to PAC, replace 46 out of 154 structures and reconductor with Optical Ground Wire (OPGW); $17.3 million}}+{{ :b143:b-146_2019-12-19_order_26317.pdf |2019December 19: Order}}
  
-{{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}}+{{ ::19-146_2019-11-07_staff_recommendation.pdf |2019, November 7: staff recommendation}} 
 + 
 +{{ ::19-146_2019-09-04_eversource_petition_crossing_baboosic.pdf |2019, September 4: crossing petition; 795 ASCR 36/1, (2) 7#8 Aumoweld ADSS Wire: 72 Fiber ADSS (0.643”)}}
  
-{{ ::19-146_2019-09-04_eversource_petition_crossing_baboosic.pdf |2019, September 4, E$ crossing petition}}+{{ ::b143_map_and_drawings.pdf |2019, September 4crossing exhibits}}
  
-{{ ::19-146_2019-11-07_staff_recommendation.pdf |2019, November 7,, staff recommendation}} 
  
-{{ ::b143_map_and_drawings.pdf |2019, August 20, crossing diagrams}} 