User Tools

Site Tools


b-143

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
b-143 [2023/10/27 03:29] sigridundsetb-143 [2024/04/24 02:43] (current) sigridundset
Line 1: Line 1:
 B-143 115kV line B-143 115kV line
  
 +
 +{{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}}
 +
 +{{ :b-143:b-143_2023-018-application-.pdf |2023, August 23: petition to cross; "Replacement structures will be weathering steel equivalents that will be located within 10’ of the existing structure location. The B143’s existing two static wires at all of the crossing locations that are the subject of this application will also be replaced with two optical ground wire (OPGW), whose specifications are identified on Exhibit 2
 +through 4."}}
 +
 +{{ :b-143:b-143_-2023-018-application-exhibits.pdf |2023, petition to cross, exhibits, Baboosic Brook}}
  
 {{ ::c196:aot2413_rm.pdf |2023, June 28: DES permit with waivers grantee}} {{ ::c196:aot2413_rm.pdf |2023, June 28: DES permit with waivers grantee}}
Line 18: Line 25:
 {{ ::b-143:aot-2413_permit_application_package_r.pdf |2023: May 3: Alteration of Terrain application}} {{ ::b-143:aot-2413_permit_application_package_r.pdf |2023: May 3: Alteration of Terrain application}}
  
-{{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}}+{{ :b143:b-146_019-12-19_order_26317_summary.pdf |2019, December 19: Order summary}} 
 + 
 +{{ :b143:b-146_2019-12-19_order_26317.pdf |2019, December 19: Order}} 
 + 
 +{{ ::19-146_2019-11-07_staff_recommendation.pdf |2019, November 7: staff recommendation}} 
 + 
 +{{ ::19-146_2019-09-04_eversource_petition_crossing_baboosic.pdf |2019, September 4: crossing petition; 795 ASCR 36/1, (2) 7#8 Aumoweld ADSS Wire: 72 Fiber ADSS (0.643”)}}
  
-{{ ::19-146_2019-09-04_eversource_petition_crossing_baboosic.pdf |2019, September 4, E$ crossing petition}}+{{ ::b143_map_and_drawings.pdf |2019, September 4crossing exhibits}}
  
-{{ ::19-146_2019-11-07_staff_recommendation.pdf |2019, November 7,, staff recommendation}} 
  
-{{ ::b143_map_and_drawings.pdf |2019, August 20, crossing diagrams}} 
b-143.1698391749.txt.gz · Last modified: 2023/10/27 03:29 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki