Both sides previous revisionPrevious revisionNext revision | Previous revision |
b-143 [2024/04/10 09:27] – sigridundset | b-143 [2024/04/24 02:43] (current) – sigridundset |
---|
{{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} | {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} |
| |
{{ :b-143:b-143_2023-018-application-.pdf |2023, petition to cross}} | {{ :b-143:b-143_2023-018-application-.pdf |2023, August 23: petition to cross; "Replacement structures will be weathering steel equivalents that will be located within 10’ of the existing structure location. The B143’s existing two static wires at all of the crossing locations that are the subject of this application will also be replaced with two optical ground wire (OPGW), whose specifications are identified on Exhibit 2 |
| through 4."}} |
| |
{{ :b-143:b-143_-2023-018-application-exhibits.pdf |2023, petition to cross, exhibits}} | {{ :b-143:b-143_-2023-018-application-exhibits.pdf |2023, petition to cross, exhibits, Baboosic Brook}} |
| |
{{ ::c196:aot2413_rm.pdf |2023, June 28: DES permit with waivers grantee}} | {{ ::c196:aot2413_rm.pdf |2023, June 28: DES permit with waivers grantee}} |
{{ ::b-143:aot-2413_permit_application_package_r.pdf |2023: May 3: Alteration of Terrain application}} | {{ ::b-143:aot-2413_permit_application_package_r.pdf |2023: May 3: Alteration of Terrain application}} |
| |
{{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} | {{ :b143:b-146_019-12-19_order_26317_summary.pdf |2019, December 19: Order summary}} |
| |
{{ ::19-146_2019-09-04_eversource_petition_crossing_baboosic.pdf |2019, September 4, E$ crossing petition}} | {{ :b143:b-146_2019-12-19_order_26317.pdf |2019, December 19: Order}} |
| |
{{ ::19-146_2019-11-07_staff_recommendation.pdf |2019, November 7,, staff recommendation}} | {{ ::19-146_2019-11-07_staff_recommendation.pdf |2019, November 7: staff recommendation}} |
| |
{{ ::b143_map_and_drawings.pdf |2019, August 20, crossing diagrams}} | {{ ::19-146_2019-09-04_eversource_petition_crossing_baboosic.pdf |2019, September 4: crossing petition; 795 ASCR 36/1, (2) 7#8 Aumoweld ADSS Wire: 72 Fiber ADSS (0.643”)}} |
| |
| {{ ::b143_map_and_drawings.pdf |2019, September 4: crossing exhibits}} |
| |
| |