 C-129 115kV line C-129 115kV line
  
 +{{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}}
  
-{{ ::a2_eversourcce_115kv_wood_pole_and_shield_wire_replacements_2020_2023_rev1_redline.pdf |2019, December 2020-2023 revisions PAC presentation}}+{{ ::a2_eversourcce_115kv_wood_pole_and_shield_wire_replacements_2020_2023_rev1_redline.pdf |2023, December 2020-2023 Revision 1 PAC presentation}}
  
 [[https://www.iso-ne.com/static-assets/documents/2022/07/es_20_tca_08_r1_determination_es_c129.pdf|2022, June 3: request to ISO for pool supported cost treatment]] [[https://www.iso-ne.com/static-assets/documents/2022/07/es_20_tca_08_r1_determination_es_c129.pdf|2022, June 3: request to ISO for pool supported cost treatment]]
  
-{{ :c129:c-129_2021-03-15_order_26461.pdf |2021, March 15: order granting crossing. "The Company proposes to replace four existing wood structures with newly constructed steel support structures to ensure continued safe and reliable operation. Two existing shield wires will be replaced with two optical ground The scope of this project is located to the south of Flagg Road and east of Stillwater Circle in Rochester beginning at Structure 208 then traversing northeast to Structures 209, 210, and 211 thereby creating two public water crossingswires (OPGWs); the OPGWs and three existing conductors will be transferred to the new structures}}+{{ :c129:c-129_2021-03-15_order_26461.pdf |2021, March 15: order granting crossing. "The Company proposes to replace four existing wood structures with newly constructed steel support structures to ensure continued safe and reliable operation. Two existing shield wires will be replaced with two optical ground The scope of this project is located to the south of Flagg Road and east of Stillwater Circle in Rochester beginning at Structure 208 then traversing northeast to Structures 209, 210, and 211 thereby creating two public water crossings...the OPGWs and three existing conductors will be transferred to the new structures}}
  
-{{ :c129:c-129_2020-11-30_staff_rec.pdf |2020November 30staff recommendation; "All (3) existing ACSR 795 kcmil conductors for the C129 +{{ :c129:373_012121_pac_minutes_final.pdf |2021January 21Minutes from PAC meeting.}}
-line will be transferred to the new structures with replacement of the (2) existing shield +
-wires with (2) 48 fiber optical ground wire (OPGW)"}}+
  
-{{ :c129:c-129_2020-11-25_eversource_att_supplement.pdf |2020November 25revised exhibit for Isinglass River crossing}}+{{ ::a5_eversource_copper_conductor_and_shield_wire_replacement_project.pdf |2021January 19 & 21PAC presentation; "Nearly all structures cannot support new conductor and/or OPGW"}}
  
-{{ :c129:c-129_2020-11-09_eversource_crossing_petition.pdf |2020, November 9crossing petition}}+{{ :c129:c-129_2020-11-30_staff_rec.pdf |2020, November 30staff recommendation; "All (3) existing ACSR 795 kcmil [36/1] conductors for the C129 line will be transferred to the new structures with replacement of the (2) existing shield wires with (2) 48 fiber optical ground wire (OPGW)"}}
  
-{{ :c129:c-129_2020-11-09_eversource_att_crossing_petition.pdf |2020, November 9crossing petition exhibits}}+{{ :c129:c-129_2020-11-25_eversource_att_supplement.pdf |2020, November 25revised exhibit for Isinglass River crossings}}
  
-{{ ::a5_eversource_copper_conductor_and_shield_wire_replacement_project.pdf |2021January 19 & 21PAC presentation}}+{{ :c129:c-129_2020-11-09_eversource_crossing_petition.pdf |2020November 9crossing petition; " replace four original wood structures (208, 209, 210 & 211) at the two crossing spans... with steel structures...replacement of the two existing shield wires with two OPGW communications wires"}}
  
-{{ ::c129:c-129_11-073_2011-04-05_psnh_petition_for_license_to_construct_lines_over_rivers.pdf |2011, April 5: petition for crossings; “As presently existing, an 8.51 mile length of the C-129 line between Deerfield and Rochester Substations (from structure 3 to structure 113) is constructed with 477 18/1 ACSR conductor. The other portions of this line, from Deerfield Substation to structure 3, and from structure 113 to Rochester Substation, are constructed of 795 ACSR 36/conductor. The replacement aspect of this project will remove all of the existing 477 ACSR 18/(conductor) and 3#6 Alumoweld (static wire) and install new 795 ACSR 26/7 (conductor) and 9#10 Alumoweld (static wire) for the 8.51 mile length of the line between structures 3 and 113. Replacing this conductor will remove an overload condition that will occur when the new transformer at Deerfield Substation is placed in service. On the other portions of the C-i29 line with existing 795 ACSR 36/1 conductor, the conductor and static wires will remain but will be up-rated for operation.”}}+{{ :c129:c-129_2020-11-09_eversource_att_crossing_petition.pdf |2020, November 9: crossing petition exhibits, clearance 23.9' and 20.7'}} 
 + 
 +{{ ::c129:c-129_11-073_2011-04-05_psnh_petition_for_license_to_construct_lines_over_rivers.pdf |2011, April 5: petition for crossings; “As presently existing, an 8.51 mile length of the C-129 line between Deerfield and Rochester Substations (from structure 3 to structure 113) is constructed with 477 18/1 ACSR conductor. The other portions of this line, from Deerfield Substation to structure 3, and from structure 113 to Rochester Substation, are constructed of 795 ACSR 36/conductor. The replacement aspect of this project will remove all of the existing 477 ACSR 18/(conductor) and 3#6 Alumoweld (static wire) and install new 795 ACSR 26/7 (conductor) and 9#10 Alumoweld (static wire) for the 8.51 mile length of the line between structures 3 and 113. Replacing this conductor will remove an overload condition that will occur when the new transformer at Deerfield Substation is placed in service. On the other portions of the C-129 line with existing 795 ACSR 36/1 conductor, the conductor and static wires will remain but will be up-rated for operation.”}}
  
 {{ :c129:c-129_2011-04-05_psnh_att_petition_for_license_to_construct_lines_over_rivers.pdf |2011, April 5: crossing exhibits with structure diagrams. Bean, North and Oyster River crossings have 795 ASCR 26/7 and 19#10 Alumoweld and the easement includes the L-175 307 345kV lines. Bellamy and Isinglass crossing are 795 ASCR 36/1, 7#8 Alumoweld and the easement includes the L-175}} {{ :c129:c-129_2011-04-05_psnh_att_petition_for_license_to_construct_lines_over_rivers.pdf |2011, April 5: crossing exhibits with structure diagrams. Bean, North and Oyster River crossings have 795 ASCR 26/7 and 19#10 Alumoweld and the easement includes the L-175 307 345kV lines. Bellamy and Isinglass crossing are 795 ASCR 36/1, 7#8 Alumoweld and the easement includes the L-175}}