C-129 115kV line | C-129 115kV line |
| |
| {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} |
| |
{{ ::a2_eversourcce_115kv_wood_pole_and_shield_wire_replacements_2020_2023_rev1_redline.pdf |2023, December 2020-2023 Revision 1 PAC presentation}} | {{ ::a2_eversourcce_115kv_wood_pole_and_shield_wire_replacements_2020_2023_rev1_redline.pdf |2023, December 2020-2023 Revision 1 PAC presentation}} |
| |
{{ :c129:c-129_2021-03-15_order_26461.pdf |2021, March 15: order granting crossing. "The Company proposes to replace four existing wood structures with newly constructed steel support structures to ensure continued safe and reliable operation. Two existing shield wires will be replaced with two optical ground The scope of this project is located to the south of Flagg Road and east of Stillwater Circle in Rochester beginning at Structure 208 then traversing northeast to Structures 209, 210, and 211 thereby creating two public water crossings...the OPGWs and three existing conductors will be transferred to the new structures}} | {{ :c129:c-129_2021-03-15_order_26461.pdf |2021, March 15: order granting crossing. "The Company proposes to replace four existing wood structures with newly constructed steel support structures to ensure continued safe and reliable operation. Two existing shield wires will be replaced with two optical ground The scope of this project is located to the south of Flagg Road and east of Stillwater Circle in Rochester beginning at Structure 208 then traversing northeast to Structures 209, 210, and 211 thereby creating two public water crossings...the OPGWs and three existing conductors will be transferred to the new structures}} |
| |
| {{ :c129:373_012121_pac_minutes_final.pdf |2021, January 21: Minutes from PAC meeting.}} |
| |
{{ ::a5_eversource_copper_conductor_and_shield_wire_replacement_project.pdf |2021, January 19 & 21: PAC presentation; "Nearly all structures cannot support new conductor and/or OPGW"}} | {{ ::a5_eversource_copper_conductor_and_shield_wire_replacement_project.pdf |2021, January 19 & 21: PAC presentation; "Nearly all structures cannot support new conductor and/or OPGW"}} |