C-189 Not on June 2023 Asset Condition Project list | ====== C-189 Not on June 2023 Asset Condition Project list ====== |
| |
{{ ::a05_2023_06_15_pac_laminated_wood_structure_replacements_phase_3.pdf |2023, June 15: PAC presentation}} | |
| |
{{ ::c-189_g146_h137_m108_maps.pdf |2023, August 2: project maps}} | {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} |
| |
{{ ::c189:aot2376_rm.pdf |}} | {{ :p145:e_more_photos.pdf |2024, December: photos provided for SEC or PUC}} |
| |
| {{ :draft_project_list_presentation-oct_2023.pdf |2023, October: ES Draft presentation to PAC}} |
| |
| {{ ::c-189_g146_h137_m108_maps.pdf |2023, August 2: Environmental Resources maps}} |
| |
| {{ ::a05_2023_06_15_pac_laminated_wood_structure_replacements_phase_3.pdf |2023, June 15: PAC presentation, replace 44/53 structures, $12.8 m.}} |
| |
| {{ ::c189_-_m108_-_h137_-_g146_des_permit_with_waivers.pdf |2023, May 22: DES permit waiving |
| specific requirements of Env-Wq 1503.21(d)(6 & 7) and Env-Wq 1504.09, }} |
| |
| {{ :c189:m108_-_h137_-_c189_-_g146_start_of_construction_form.pdf |2023, May 22: Start of Construction form}} |
| |
| {{ ::c189_g146_m137_m108_5-22-2023.pdf |2023, May 22: Environmental Resources permitting maps}} |
| |
{{ ::c189:aot-2376_wildlifeprotectionplan_20230428.pdf |2023, April 28: Wildlife protection plan}} | {{ ::c189:aot-2376_wildlifeprotectionplan_20230428.pdf |2023, April 28: Wildlife protection plan}} |
| |
{{ ::c189:aot_stamped_9-8-2022.pdf |2022, August 9: stamped AOT first page}} | {{ ::c189:aot2376_rm.pdf |2023, May 22: DES permit with waivers granted}} |
| |
| {{ :c189:m108_-_h137_-_c189_-_g146_aot_application_checklist.pdf |2023, February 1: AoT application checklist}} |
| |
| {{ :c189:c189_-_m108_-_h137_-_g146_aot_application.pdf |2023, January 27: AoT application}} |
| |
| {{ ::c189:aot_stamped_9-8-2022.pdf |2022, September 9: stamped AOT first page}} |
| |
{{ ::c189:aot_stamped-8-12-2022.pdf |2022, August 12: Alteration of Terrain plans}} | {{ ::c189:aot_stamped-8-12-2022.pdf |2022, August 12: Alteration of Terrain plans}} |
| |
| {{ :p145:p145_-_c189_-_m180_-_h137_f_g_email.pdf |2022, October 3: Fish and Game email}} |
| |
| {{ :p145:p145_-_h137_-_m108_-_c189_aot_amended_application.pdf |2022, September 17:Amended AOT application}} |
| |
| {{ :p145:p145_h137_m108_c189_aot_9-8-2022.pdf |2022, September 8: Alteration of Terrain application}} |
| |
| {{ :p145:p145_h137_m108_c189_aot_cover_8-12-2022.pdf |2022, August 12: AOT cover }} |
| |
| {{ :p145:p145_h137_m108_c189_permitting_map_set_8-12-2022.pdf |2022, August 12 permitting maps set}} |
| |
| {{ :p145:p145_-_h137_-_m108_-_c189_des_permit_with_waivers.pdf |2022, August 12: DES permit with waivers for Env-Wq 1503.12(d)(1&2), Env-Wq 1503.21(d)(6&7), and Env-Wq 1504.09,}} |
| |
| {{:ac:c-129_reliability_reconductor_10-2012.png?linkonly|2012, October, proposed reliability project, recondutoring}} |