User Tools

Site Tools


c-189

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
c-189 [2023/09/01 05:10] sigridundsetc-189 [2025/01/19 00:39] (current) sigridundset
Line 1: Line 1:
-C-189 Not on June 2023 Asset Condition Project list+====== C-189 Not on June 2023 Asset Condition Project list ======
  
-{{ ::c-189_g146_h137_m108_maps.pdf |2023, August 2: project maps}} 
  
-{{ ::a05_2023_06_15_pac_laminated_wood_structure_replacements_phase_3.pdf |2023, June 15:  PAC presentation}}+{{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} 
 + 
 +{{ :p145:e_more_photos.pdf |2024, December: photos provided for SEC or PUC}} 
 + 
 +{{ :draft_project_list_presentation-oct_2023.pdf |2023, October: ES Draft presentation to PAC}} 
 + 
 +{{ ::c-189_g146_h137_m108_maps.pdf |2023, August 2: Environmental Resources maps}} 
 + 
 +{{ ::a05_2023_06_15_pac_laminated_wood_structure_replacements_phase_3.pdf |2023, June 15:  PAC presentation, replace 44/53 structures, $12.8 m.}} 
 + 
 +{{ ::c189_-_m108_-_h137_-_g146_des_permit_with_waivers.pdf |2023, May 22: DES permit waiving 
 +specific requirements of Env-Wq 1503.21(d)(6 & 7) and Env-Wq 1504.09, }} 
 + 
 +{{ :c189:m108_-_h137_-_c189_-_g146_start_of_construction_form.pdf |2023, May 22: Start of Construction form}} 
 + 
 +{{ ::c189_g146_m137_m108_5-22-2023.pdf |2023, May 22: Environmental Resources permitting maps}}
  
 {{ ::c189:aot-2376_wildlifeprotectionplan_20230428.pdf |2023, April 28: Wildlife protection plan}} {{ ::c189:aot-2376_wildlifeprotectionplan_20230428.pdf |2023, April 28: Wildlife protection plan}}
  
 {{ ::c189:aot2376_rm.pdf |2023, May 22: DES permit with waivers granted}} {{ ::c189:aot2376_rm.pdf |2023, May 22: DES permit with waivers granted}}
 +
 +{{ :c189:m108_-_h137_-_c189_-_g146_aot_application_checklist.pdf |2023, February 1: AoT application checklist}}
 +
 +{{ :c189:c189_-_m108_-_h137_-_g146_aot_application.pdf |2023, January 27: AoT application}}
  
 {{ ::c189:aot_stamped_9-8-2022.pdf |2022, September 9: stamped AOT first page}} {{ ::c189:aot_stamped_9-8-2022.pdf |2022, September 9: stamped AOT first page}}
Line 13: Line 31:
 {{ ::c189:aot_stamped-8-12-2022.pdf |2022, August 12: Alteration of Terrain plans}} {{ ::c189:aot_stamped-8-12-2022.pdf |2022, August 12: Alteration of Terrain plans}}
  
 +{{ :p145:p145_-_c189_-_m180_-_h137_f_g_email.pdf |2022, October 3: Fish and Game email}}
 +
 +{{ :p145:p145_-_h137_-_m108_-_c189_aot_amended_application.pdf |2022, September 17:Amended AOT application}}
 +
 +{{ :p145:p145_h137_m108_c189_aot_9-8-2022.pdf |2022, September 8: Alteration of Terrain application}}
 +
 +{{ :p145:p145_h137_m108_c189_aot_cover_8-12-2022.pdf |2022, August 12: AOT cover }}
 +
 +{{ :p145:p145_h137_m108_c189_permitting_map_set_8-12-2022.pdf |2022, August 12 permitting maps set}}
 +
 +{{ :p145:p145_-_h137_-_m108_-_c189_des_permit_with_waivers.pdf |2022, August 12: DES permit with waivers for  Env-Wq 1503.12(d)(1&2), Env-Wq 1503.21(d)(6&7), and Env-Wq 1504.09,}}
  
 +{{:ac:c-129_reliability_reconductor_10-2012.png?linkonly|2012, October, proposed reliability project, recondutoring}}
c-189.1693559453.txt.gz · Last modified: 2023/09/01 05:10 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki