User Tools

Site Tools


c-189

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
c-189 [2023/10/23 04:00] sigridundsetc-189 [2025/01/19 00:39] (current) sigridundset
Line 1: Line 1:
-C-189 Not on June 2023 Asset Condition Project list+====== C-189 Not on June 2023 Asset Condition Project list ====== 
 + 
 + 
 +{{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} 
 + 
 +{{ :p145:e_more_photos.pdf |2024, December: photos provided for SEC or PUC}} 
 + 
 +{{ :draft_project_list_presentation-oct_2023.pdf |2023, October: ES Draft presentation to PAC}}
  
 {{ ::c-189_g146_h137_m108_maps.pdf |2023, August 2: Environmental Resources maps}} {{ ::c-189_g146_h137_m108_maps.pdf |2023, August 2: Environmental Resources maps}}
  
-{{ ::a05_2023_06_15_pac_laminated_wood_structure_replacements_phase_3.pdf |2023, June 15:  PAC presentation}}+{{ ::a05_2023_06_15_pac_laminated_wood_structure_replacements_phase_3.pdf |2023, June 15:  PAC presentation, replace 44/53 structures, $12.8 m.}}
  
 {{ ::c189_-_m108_-_h137_-_g146_des_permit_with_waivers.pdf |2023, May 22: DES permit waiving {{ ::c189_-_m108_-_h137_-_g146_des_permit_with_waivers.pdf |2023, May 22: DES permit waiving
Line 35: Line 42:
  
 {{ :p145:p145_-_h137_-_m108_-_c189_des_permit_with_waivers.pdf |2022, August 12: DES permit with waivers for  Env-Wq 1503.12(d)(1&2), Env-Wq 1503.21(d)(6&7), and Env-Wq 1504.09,}} {{ :p145:p145_-_h137_-_m108_-_c189_des_permit_with_waivers.pdf |2022, August 12: DES permit with waivers for  Env-Wq 1503.12(d)(1&2), Env-Wq 1503.21(d)(6&7), and Env-Wq 1504.09,}}
 +
 +{{:ac:c-129_reliability_reconductor_10-2012.png?linkonly|2012, October, proposed reliability project, recondutoring}}
c-189.1698048026.txt.gz · Last modified: 2023/10/23 04:00 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki