Both sides previous revisionPrevious revisionNext revision | Previous revision |
c-196 [2024/04/06 08:56] – sigridundset | c-196 [2024/04/24 01:36] (current) – sigridundset |
---|
C-196 | C-196 |
| |
| {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} |
| |
{{ ::a04_es_asset_condition_wood_structure_replacements.pdf |2023, January 19, presentation to PAC, 29 out of 145 structures replaced, $6.2 m.}} | {{ ::a04_es_asset_condition_wood_structure_replacements.pdf |2023, January 19, presentation to PAC, 29 out of 145 structures replaced, $6.2 m.}} |
| |
{{ ::c196_-_a253_aot_application.pdf |2022, November 28: AOT application}} | {{ ::c196_-_a253_aot_application.pdf |2022, November 28: AOT application}} |
| |
| {{ :c196:c-196_tca_app.pdf |2022, September 20: application for TCA}} |
| |
{{ ::c196_-_q171_cover_page_aot.pdf |2022, September 9: AOT transmittal cover page}} | {{ ::c196_-_q171_cover_page_aot.pdf |2022, September 9: AOT transmittal cover page}} |
and licensed by the Commission, crosses Glen Lake with 3 phase wires and two static wires. PSNH proposes to replace one of the static wires with an optical ground wire (OPGW).; "The C- 196 line as presently constructed and licensed by the Commission, crosses Glen Lake with 3 phase wires and two static wires. PSNH proposes to replace one of the static wires with an optical ground wire (OPGW)."}} | and licensed by the Commission, crosses Glen Lake with 3 phase wires and two static wires. PSNH proposes to replace one of the static wires with an optical ground wire (OPGW).; "The C- 196 line as presently constructed and licensed by the Commission, crosses Glen Lake with 3 phase wires and two static wires. PSNH proposes to replace one of the static wires with an optical ground wire (OPGW)."}} |
| |
{{ :c196:c-196_2010-09-03_psnh_petition_for_license_for_cable_across_glen_lake_-goffstown_nh.pdf |2010, September 3: petition for crossing Glen Lake; The structures have also been determined to be able to accept the increased loads imparted by the larger cable diameter... }} | {{ :c196:c-196_2010-09-03_psnh_petition_for_license_for_cable_across_glen_lake_-goffstown_nh.pdf |2010, September 3: petition for crossing Glen Lake; The structures have also been determined to be able to accept the increased loads imparted by the larger cable diameter...The static wire (OPGW cable) will be carried on the structure by a support |
| bracket at the top of the crossarm and is approximately 7-ft 6-in up vertically from the |
| phase wire." }} |
| |
| {{ :c196:c-196_6-6-1975_glen_lake_crossing.pdf |1975, June 6: petition for crossing Glen Lake; "reconstruct two parallel 115 KV electric transmission lines of wires and cables over and across Glen Lake in the Town of Goffstown, New Hampshire, which are part of its 115KV system connecting the Greggs Substation in Goffstown and the Merrimack Substation in Bow;"}} |
| |
{{ :c196:c-196_maybe_1975_glen_lake_crossing.odt |1975: Petition for crossing Glen Lake}} | |
| |
| |