d-121
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
d-121 [2023/10/19 04:01] – sigridundset | d-121 [2024/04/11 03:12] (current) – sigridundset | ||
---|---|---|---|
Line 1: | Line 1: | ||
D-121 115kV line | D-121 115kV line | ||
- | {{ :d121: | + | {{ :may_18_2023_e_pac_lines_map.png? |
- | {{ :d121:d121_aot_cover_sheet_.pdf |2021, August 18: AoT cover sheet}} | + | {{ :d121:d-121_2023-015-application.pdf |2023, June 14: structure structure will be replaced with a weathering steel equivalent, the existing three conductors, and two OPGW wires will be unchanged |
- | {{ :d121:d121_des_permit_with_waivers.pdf |2021, August 18: DES permit waiving specific requirements of Env-Wq 1504.09, }} | + | {{ :d121:d-121_2023-015-application-exhibits.pdf |2023, June 14:crossing exhibits; 795 ASCR 36/1 Coot, 48 fiber .646 AFL S3-81/69/646 OPGW}} |
+ | |||
+ | {{ : | ||
{{ : | {{ : | ||
specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7), and Env-Wq 1504.09,}} | specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7), and Env-Wq 1504.09,}} | ||
- | {{ :d121:d121_aot_application.pdf |}} | + | {{ ::391: |
- | {{ :d121:d121_water_resources_aot_3-23-2023.pdf |}} | + | {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 18 out of 154 structures; $5. million}} |
- | {{ :d121:d121_aot_application_3-2023.pdf |}} | + | {{ :d121:aot2377_rm.pdf |2023, May 14: DES permit with waivers}} |
- | {{ :d121:d-121_goldenrod.pdf |}} | + | {{ :d121:aot-2377_miscellaneous.pdf |2023, March 28: Alteration of Terrain application}} |
- | {{ :d121:d121_surface_and_groundwater_overlay_aot_8-18-2021.pdf |}} | + | {{ :d121:d121_water_resources_aot_3-23-2023.pdf |2023, March 23: Water Resources maps}} |
- | {{ :d121:d121_wildlife_assessment_5-2021.pdf |}} | + | {{ :d121:d-121_goldenrod.pdf |2022, August 3: Goldenrod}} |
- | {{ :d121:aot-2377_plans.pdf |2023, May 23: Alteration of Terrain plans, water resources}} | + | {{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending}} |
- | {{ ::391: | + | {{ ::document.pdf |2021, December 9: Town of Bow, Conditional Use Permit and public hearing on wetlands damage and after-the-fact truck access}} |
- | {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 18 out of 154 structures; $5. million}} | + | {{ ::d121-cr2021-008-order-of-notice.pdf |2021, September 28: prehearing order}} |
- | {{ :may_18_2023_e_pac_lines_map.png? | + | {{ :d121: |
- | {{ :d121:aot2377_rm.pdf |2023, May 14: DES permit | + | {{ :d121:d121_des_permit_with_waivers.pdf |2021, August 18: DES permit |
- | {{ :d121:aot-2377_miscellaneous.pdf |2023, March 28: Alteration of Terrain application}} | + | {{ :d121:d121_surface_and_groundwater_overlay_aot_8-18-2021.pdf |2021, August 18: Surface and Groundwater maps}} |
- | {{ ::document.pdf |2021, | + | {{ ::21-111_2021.08.26_eversource_replacement-crossing-petition.pdf |2021, |
- | {{ ::d121-cr2021-008-order-of-notice.pdf |2021, | + | {{ :d121:a3_eversource_115_kv_and_230_kv_wood_pole_and_shield_wire_replacement.pdf |2021, |
- | {{ :d121:20211017105536.pdf |2021, | + | {{ :d121:d121_wildlife_assessment_5-2021.pdf |2021, |
- | {{ :d121:aot2002_rm.pdf |2021, | + | {{ :d121:d121_aot_application.pdf |2021, |
- | {{ :d121:aot-2002_plans.pdf |2021, August 18, surface and groundwater overlay}} | + | {{ :d121:d121_wildlife_assessment_5-2021.pdf |2021, |
- | + | ||
- | {{ :: | + | |
- | + | ||
- | {{ : | + | |
d-121.1697702494.txt.gz · Last modified: 2023/10/19 04:01 by sigridundset