 D-121 115kV line D-121 115kV line
  
-{{ :d121:d121_aot_checklist.pdf |2023, June 14: AoT checklist}}+{{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}}
  
-{{ :d121:d121_aot_cover_sheet_.pdf |2021August 18AoT cover sheet}}+{{ :d121:d-121_2023-015-application.pdf |2023June 14structure structure will be replaced with a weathering steel equivalent, the existing three conductors, and two OPGW wires will be unchanged }}
  
-{{ :d121:d121_des_permit_with_waivers.pdf |2021August 18DES permit waiving specific requirements of Env-Wq 1504.09, }}+{{ :d121:d-121_2023-015-application-exhibits.pdf |2023June 14:crossing exhibits; 795 ASCR 36/1 Coot, 48 fiber .646 AFL S3-81/69/646 OPGW}} 
 + 
 +{{ :d121:d121_aot_checklist.pdf |2023June 14: AoT checklist}}
  
 {{ :d121:d121_permit_with_waivers.pdf |2023, May 14: DES permit waiving {{ :d121:d121_permit_with_waivers.pdf |2023, May 14: DES permit waiving
 specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7), and Env-Wq 1504.09,}} specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7), and Env-Wq 1504.09,}}
  
-{{ :d121:d121_aot_application.pdf |}}+{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}
  
-{{ :d121:d121_water_resources_aot_3-23-2023.pdf |}}+{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 18 out of 154 structures; $5. million}}
  
-{{ :d121:d121_aot_application_3-2023.pdf |}}+{{ :d121:aot2377_rm.pdf |2023, May 14: DES permit with waivers}}
  
-{{ :d121:d-121_goldenrod.pdf |}}+{{ :d121:aot-2377_miscellaneous.pdf |2023, March 28: Alteration of Terrain application}}
  
-{{ :d121:d121_surface_and_groundwater_overlay_aot_8-18-2021.pdf |}}+{{ :d121:d121_water_resources_aot_3-23-2023.pdf |2023, March 23: Water Resources maps}}
  
-{{ :d121:d121_wildlife_assessment_5-2021.pdf |}}+{{ :d121:d-121_goldenrod.pdf |2022, August 3: Goldenrod}}
  
-{{ :d121:aot-2377_plans.pdf |2023May 23Alteration of Terrain plans, water resources}}+{{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022June 30complete DE-22-049 document listing E$ proposed spending}}
  
-{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}+{{ ::document.pdf |2021December 9: Town of Bow, Conditional Use Permit and public hearing on wetlands damage and after-the-fact truck access}}
  
-{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023May 18, presentation to PAC, replace 18 out of 154 structures; $5. million}}+{{ ::d121-cr2021-008-order-of-notice.pdf |2021September 28: prehearing order}}
  
-{{ :may_18_2023_e_pac_lines_map.png?linkonly |2023May 18: map showing line location}}+{{ :d121:d121_aot_cover_sheet_.pdf |2021August 18: AoT cover sheet}}
  
-{{ :d121:aot2377_rm.pdf |2023May 14: DES permit with waivers}}+{{ :d121:d121_des_permit_with_waivers.pdf |2021August 18: DES permit waiving specific requirements of Env-Wq 1504.09, }}
  
-{{ :d121:aot-2377_miscellaneous.pdf |2023March 28Alteration of Terrain application}}+{{ :d121:d121_surface_and_groundwater_overlay_aot_8-18-2021.pdf |2021August 18Surface and Groundwater maps}}
  
-{{ ::document.pdf |2021, December 9:: Town of Bow public hearing on wetlands damage and after-the-fact truck access}}+{{ ::21-111_2021.08.26_eversource_replacement-crossing-petition.pdf |2021, August petition}}
  
-{{ ::d121-cr2021-008-order-of-notice.pdf |2021, September 28:prehearing order}}+{{ :d121:a3_eversource_115_kv_and_230_kv_wood_pole_and_shield_wire_replacement.pdf |2021, June 16presentation to PAC}}
  
-{{ :d121:20211017105536.pdf |2021, August 18, stamped alteration of terrain first page}}+{{ :d121:d121_wildlife_assessment_5-2021.pdf |2021, May 18: Wildlife assessment}}
  
-{{ :d121:aot2002_rm.pdf |2021, August 18DES permit with waivers}}+{{ :d121:d121_aot_application.pdf |2021, May 17Original AoT application}}
  
-{{ :d121:aot-2002_plans.pdf |2021, August 18, surface and groundwater overlay}} +{{ :d121:d121_wildlife_assessment_5-2021.pdf |2021, MayWildlife assessment}}
- +
-{{ ::21-111_2021.08.26_eversource_replacement-crossing-petition.pdf |2021, August petition}} +
- +
-{{ :d121:a3_eversource_115_kv_and_230_kv_wood_pole_and_shield_wire_replacement.pdf |2021, June 16presentation to PAC}}+
  
  
  
  