d-121 [2024/04/11 03:09] sigridundsetd-121 [2024/04/11 03:12] (current) sigridundset
Line 3: Line 3:
 {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}}
  
-{{ :d121:d-121_2023-015-application.pdf |}}+{{ :d121:d-121_2023-015-application.pdf |2023, June 14: structure structure will be replaced with a weathering steel equivalent, the existing three conductors, and two OPGW wires will be unchanged }}
  
-{{ :d121:d-121_2023-015-application-exhibits.pdf |2023:  crossing exhibits; 795 AXCR 36/1 Coot, 48 fiber .646 AFL S3-81/69/646 OPGW}}+{{ :d121:d-121_2023-015-application-exhibits.pdf |2023, June 14:crossing exhibits; 795 ASCR 36/1 Coot, 48 fiber .646 AFL S3-81/69/646 OPGW}}
  
 {{ :d121:d121_aot_checklist.pdf |2023, June 14: AoT checklist}} {{ :d121:d121_aot_checklist.pdf |2023, June 14: AoT checklist}}