 F-139 115kv line F-139 115kv line
  
-{{ ::f139:transmittal_final_documents_re_external_v182_f139_transmission_line_rebuild_project.pdf |2023, June 5:transmittal final documents}}+{{ :f139:f-139_2023-016-application.pdf |2023: crossing petition}}
  
-{{ ::eversource_franklin_northfield_canterbury_concord_des_wetlands_rfmi_5.13.23.pdf |2023, May 13:wetland damage franklin, northfield, concord}}+{{ :f139:f-139_2023-016-application-exhibits.pdf |2023: crossing exhibits}} 
 + 
 +{{ ::f139:aot-2388_plans.pdf |2023, June 15: AoT Permitting Plans}} 
 + 
 +{{ ::f139:transmittal_final_documents_re_external_v182_f139_transmission_line_rebuild_project.pdf |2023, June 5: transmittal final documents}} 
 + 
 +{{ :v182:v182_-_f139_expired_links_to_aots.pdf |2023, June 5: expired links to AoT documents}} 
 + 
 +{{ :f139:d182_-_f139_des_permit_with_waivers_5-29-2023.pdf |2023, May 29: AoT permit waiving 
 +specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(c)(2), and Env-Wq 1504.09,}} 
 + 
 +{{ :f139:f139_aot_applications.pdf |2023, March 10: AoT application, VHB}} 
 + 
 +{{ ::eversource_franklin_northfield_canterbury_concord_des_wetlands_rfmi_5.13.23.pdf |2023, May 13: DES request for more information}}
  
 {{ ::v182-f139-project-fact-sheet.pdf |2023, April: project fact sheet}} {{ ::v182-f139-project-fact-sheet.pdf |2023, April: project fact sheet}}
  
-{{ ::f139:aot-2388_nhfg_conditions.pdf |2023, March 23:nh fish and game alteration of terrain conditions}}+{{ :v182:v182_-_f139_aot_checklist.pdf |2023, April 5: AoT checklist}} 
 + 
 +{{ ::f139:aot-2388_nhfg_conditions.pdf |2023, March 23: nh fish and game alteration of terrain conditions}}
  
 {{ ::2023_03_16_pac_minutes_final.pdf |2023, March 16: PAC minutes}} {{ ::2023_03_16_pac_minutes_final.pdf |2023, March 16: PAC minutes}}
 +
 +{{ ::item4a_eversource_v182_f139_transmission_lines.pdf |2023, February 22: Presentation to ?}}
 +
 +{{ :v182:05.10.2023.pdf |2022, May 10: Concord Conservation Commission minutes}}
 +
 +{{ :v182:4-cre-2022-009-license.pdf |2022, April 18: License for crossings}}
  
 {{ ::a2_eversourcce_115kv_wood_pole_and_shield_wire_replacements_2020_2023_rev1_redline.pdf |December 2019, 2020-2023 revisions PAC presentation}} {{ ::a2_eversourcce_115kv_wood_pole_and_shield_wire_replacements_2020_2023_rev1_redline.pdf |December 2019, 2020-2023 revisions PAC presentation}}
Line 21: Line 42:
 {{ ::de-20-058.pdf |2020, September 21: permission to cross river}} {{ ::de-20-058.pdf |2020, September 21: permission to cross river}}
  
-{{ ::f139:aot-2388_plans.pdf |2023, June 5:Asset Condition project called Maintenance Project}}+{{ ::f139:aot-2388_plans.pdf |2023, June 5:Asset Condition projects called Maintenance Projects}}
  
 {{ ::f139:aot-2388_aot_package.pdf |2023, March 10: Alteration of Terrain application "The total land disturbance for the project was calculated to be approximately 61.1 acres. The disturbance area includes the work pads, access roads, and the estimated limits of necessary grading." }} {{ ::f139:aot-2388_aot_package.pdf |2023, March 10: Alteration of Terrain application "The total land disturbance for the project was calculated to be approximately 61.1 acres. The disturbance area includes the work pads, access roads, and the estimated limits of necessary grading." }}
  
-{{ ::f139_maps.pdf |maps}}+{{ ::f139_maps.pdf |2020, April 3: water crossing application maps}}
  
 {{ ::9.20.17_storm_hardening_-_f139_final.pdf |2017, September 20: Dear Neighbor letter}} {{ ::9.20.17_storm_hardening_-_f139_final.pdf |2017, September 20: Dear Neighbor letter}}