User Tools

Site Tools


f-162

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
f-162 [2024/04/10 12:27] sigridundsetf-162 [2024/04/28 04:45] (current) sigridundset
Line 8: Line 8:
  
 {{ :a05_2023_06_15_pac_laminated_wood_structure_replacements_phase_3.pdf |2023, June 15, PAC presentation}} {{ :a05_2023_06_15_pac_laminated_wood_structure_replacements_phase_3.pdf |2023, June 15, PAC presentation}}
 +
 +{{ :f162:f-162_2023-025-license.pdf |2023, November 27: License}}
 +
 +{{ :f162:f-162_2023-025-staff-recommendation.pdf |2023, November 20: staff recommendation}}
  
 {{ ::f162:f-162_-2023-025-application.pdf |2023, November 6: crossing application; "In addition to the structure replacements and the Greggs substation expansion, the existing pole top static wire is being removed and replaced with an OPGW wire “48F ᴓ 0.646” AFL DNO-11852”. The three existing conductors and the {{ ::f162:f-162_-2023-025-application.pdf |2023, November 6: crossing application; "In addition to the structure replacements and the Greggs substation expansion, the existing pole top static wire is being removed and replaced with an OPGW wire “48F ᴓ 0.646” AFL DNO-11852”. The three existing conductors and the
 second existing OPGW wire at the crossing spans shall remain unchanged in the course of the structure replacements."}} second existing OPGW wire at the crossing spans shall remain unchanged in the course of the structure replacements."}}
  
-{{ ::f162:f-162_2023-025-exhibits.pdf |2023: crossing exhibits; 1590 ASCR 45/7 Lapwing,48 fiber .646 AFL OPGW, 84 fiber OPGW }}+{{ ::f162:f-162_2023-025-exhibits.pdf |2023: crossing exhibits; 1590 ASCR 45/7 Lapwing, 48 fiber .646 AFL OPGW, 84 fiber OPGW }} 
 + 
 +{{ :f162:1994_f-162_t-198_n-186_l-163_p-145_v-182_de_94-272.pdf |1995, September 6: two crossings as identified in Appendix 2 of the petition and on drawings D-7649-383/Exhibit 1, D-7649-383/Exhibit 2, D-7694-384/Exhibit 1, and D-7694-384/Exhibit 2, are over the North Branch of the Piscataquog River in New Boston, NH.}}
  
 {{ :f162:f-162_1976_greggs_to_jackman_piscataqua_river_crossing_order.pdf |1976: Order, Piscataqua River crossing; reconstructing 115 kv transmission lines over and across the north branch of the Piscataquog river in New Boston. Part of the company's Greggs to Jackman 115 kv transmission line}} {{ :f162:f-162_1976_greggs_to_jackman_piscataqua_river_crossing_order.pdf |1976: Order, Piscataqua River crossing; reconstructing 115 kv transmission lines over and across the north branch of the Piscataquog river in New Boston. Part of the company's Greggs to Jackman 115 kv transmission line}}
f-162.1712766428.txt.gz · Last modified: 2024/04/10 12:27 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki