Previous revision
g-128 [2023/11/01 06:43] sigridundsetg-128 [2024/07/23 04:14] (current) sigridundset
Line 1: Line 1:
 G-128 115kV line G-128 115kV line
  
-{{ ::a5_eversource_copper_conductor_and_shield_wire_replacement_project.pdf |2021January 21PAC presentation}}+{{ :may_18_2023_e_pac_lines_map.png?linkonly |2023May 18map showing line location}}
  
-{{ ::a2_eversourcce_115kv_wood_pole_and_shield_wire_replacements_2020_2023_rev1_redline.pdf |2020-2023revision of December 2019 PAC presentation}}+{{ ::26452e.pdf |2021February 8: PUC permit for crossing public lands/waters}}
  
-{{ ::12-18-2019_minutes.pdf |2019December 18Lee ZBA minutes}}+{{ :c129:373_012121_pac_minutes_final.pdf |2021January 21Minutes from PAC meeting.}}
  
-{{ ::19-028_2019-02-08_eversource_petition_crossing_merrimack_river_merrimack_litchfield.pdf |2019February 8:E$ to PUC crossing petition; "This structure replacement and repair project is part of a reliability project necessary for the H123 Line to continue to meet current as well as future projected electricity demands"}}+{{ ::a5_eversource_copper_conductor_and_shield_wire_replacement_project.pdf |2021January 21PAC presentation}}
  
-{{ ::26452e.pdf |}}+{{ ::a2_eversourcce_115kv_wood_pole_and_shield_wire_replacements_2020_2023_rev1_redline.pdf |2020-2023, revision of December 2019 PAC presentation}}
  
-{{ ::02102021_m.pdf |}}+{{ ::de-21-076-order-26-524.pdf |2021: order}}
  
-{{ ::de-20-185.pdf |}}+{{ ::de-20-185.pdf |2020}}
  
-{{ ::de-21-076-order-26-524.pdf |order}}+{{ ::12-18-2019_minutes.pdf |2019, December 18: Lee ZBA minutes}} 
 + 
 +{{ ::19-028_2019-02-08_eversource_petition_crossing_merrimack_river_merrimack_litchfield.pdf |2019, February 8:E$ to PUC crossing petition; "This structure replacement and repair project is part of a reliability project necessary for the H123 Line to continue to meet current as well as future projected electricity demands"}}
  
 {{ :a5_eversource_copper_conductor_and_shield_wire_replacement_project.pdf |copper conductor and shield wire replacement}} {{ :a5_eversource_copper_conductor_and_shield_wire_replacement_project.pdf |copper conductor and shield wire replacement}}
  
 +{{ ::g128:g-128_creation_2004_single_brugg_12_opgw.pdf |2004: original construction of line}}
g-128.1698835401.txt.gz · Last modified: 2023/11/01 06:43 by sigridundset