h-123 [2024/04/11 03:47] sigridundseth-123 [2024/04/28 04:51] (current) sigridundset
Line 25: Line 25:
 {{ ::4-cre-2022-014-license.pdf |2022, May 23; license for crossing}} {{ ::4-cre-2022-014-license.pdf |2022, May 23; license for crossing}}
  
-{{ ::3-cre-2022-014-energy-staff-recommendation.pdf |2022 staff recommendation; "The H123’s existing three phase conductors, a single OPGW wire, and a single static wire between Structures 201 and 202, whose specifications were identified on Exhibit 2 submitted by ES, will remain unchanged in the course of relocation to the replacement steel structures."}}+{{ ::3-cre-2022-014-energy-staff-recommendation.pdf |2022, May 4: staff recommendation; "The H123’s existing three phase conductors, a single OPGW wire, and a single static wire between Structures 201 and 202, whose specifications were identified on Exhibit 2 submitted by ES, will remain unchanged in the course of relocation to the replacement steel structures."}}
  
-{{ ::1-cre-2022-014-petition.pdf |2022, May 2: E$ petition to cross public waters/lands}}+{{ ::1-cre-2022-014-petition.pdf |2022, May 2: E$ petition to cross public waters/lands and replace one structure}}
  
 {{ ::2-cre-2022-014-petition-attachments.pdf |2022 petition attachments}} {{ ::2-cre-2022-014-petition-attachments.pdf |2022 petition attachments}}
 +
 +{{ :h123:h-123_2019-09-04_order_26290_summary.pdf |2019, September 4: order summary}}
 +
 +{{ :h123:h-123_2019-09-04_order_26290.pdf |2019, September 4: order}}
 +
 +{{ :h123:h-123_2019-08-27_eversource_revised_attachment.pdf |2019, August 27: revised attachment}}
 +
 +{{ :h123:h-123_019-06-28_staff_recommendation.pdf |2019, June 28: staff recommendation}}
  
 {{ ::h123_petition.pdf |2019, February 9; E$  petition for crossing Merrimack River; Shield Wire: 7#8 Alumoweld, Transmission Wire: 795 kcmil ACSR 36/1, ADSS Wire: ADSS 72 Fiber}} {{ ::h123_petition.pdf |2019, February 9; E$  petition for crossing Merrimack River; Shield Wire: 7#8 Alumoweld, Transmission Wire: 795 kcmil ACSR 36/1, ADSS Wire: ADSS 72 Fiber}}
  
-{{ ::h123_diagrams.pdf |2019, January 11: exhibits for petition}}+{{ ::h123_diagrams.pdf |2019, February 9: exhibits for petition}}
  
 {{ ::h-123_epa_reports.pdf |2018, December; EPA reports}} {{ ::h-123_epa_reports.pdf |2018, December; EPA reports}}
Line 41: Line 49:
 {{ ::k165_p145_.pdf |2016, January 7: TCA approval, apparently reliability}} {{ ::k165_p145_.pdf |2016, January 7: TCA approval, apparently reliability}}
  
-{{ :h123:h-123_and_k-165_staff_recommendation.pdf |2012, March 6staff recommendationto alter an existing crossing of the Merrimack River in Merrimack and Litchfield, New Hampshire by altering the material, height, location of both support structures as well as increasing the conductor size and +{{ :h123:k-165_h-123_order_2012-03-08_order_no_25_333_nisi_granting_license.pdf |2012, March 8Order NisiThe project proposed in PSNH’s petition will entail the installation of a new 115kV transmission line (the H 123 Line) and the removal and replacement of a segment of an existing 115kV transmission line (the K165 Line).}}
-material, increasing the size and material of the static wire which serves as shield wire and replacing the communication wire from an ADSS type to an OPGW line (84 fiber optic cable). The relocation of the existing support structures of an existing 115 kv transmission line (Circuit K- 165 referred to as +
-the “Busch Tap”) on both sides of the Merrimack River allows for proper clearance from a newly proposed circuit H- 123 (115 kV) that will be installed between Line 380 (345kV) and the relocated K-165 (115 kV)}}+
  
 {{ :h123:h-123_exhibit_2011-11-30_psnh_appendix_a-exhibits_1_and_2.pdf |2011, November 30: crossing exhibits}} {{ :h123:h-123_exhibit_2011-11-30_psnh_appendix_a-exhibits_1_and_2.pdf |2011, November 30: crossing exhibits}}
  
 {{ ::k-165_and_or_h-123_pole_diagram_2011-11-30_psnh_diagrams-figures_1_and_2.pdf |2011, November 30: structure diagrams}} {{ ::k-165_and_or_h-123_pole_diagram_2011-11-30_psnh_diagrams-figures_1_and_2.pdf |2011, November 30: structure diagrams}}