User Tools

Site Tools


h-123

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
h-123 [2024/04/14 07:11] sigridundseth-123 [2024/04/28 04:51] (current) sigridundset
Line 25: Line 25:
 {{ ::4-cre-2022-014-license.pdf |2022, May 23; license for crossing}} {{ ::4-cre-2022-014-license.pdf |2022, May 23; license for crossing}}
  
-{{ ::3-cre-2022-014-energy-staff-recommendation.pdf |2022 staff recommendation; "The H123’s existing three phase conductors, a single OPGW wire, and a single static wire between Structures 201 and 202, whose specifications were identified on Exhibit 2 submitted by ES, will remain unchanged in the course of relocation to the replacement steel structures."}}+{{ ::3-cre-2022-014-energy-staff-recommendation.pdf |2022, May 4: staff recommendation; "The H123’s existing three phase conductors, a single OPGW wire, and a single static wire between Structures 201 and 202, whose specifications were identified on Exhibit 2 submitted by ES, will remain unchanged in the course of relocation to the replacement steel structures."}}
  
 {{ ::1-cre-2022-014-petition.pdf |2022, May 2: E$ petition to cross public waters/lands and replace one structure}} {{ ::1-cre-2022-014-petition.pdf |2022, May 2: E$ petition to cross public waters/lands and replace one structure}}
  
 {{ ::2-cre-2022-014-petition-attachments.pdf |2022 petition attachments}} {{ ::2-cre-2022-014-petition-attachments.pdf |2022 petition attachments}}
 +
 +{{ :h123:h-123_2019-09-04_order_26290_summary.pdf |2019, September 4: order summary}}
 +
 +{{ :h123:h-123_2019-09-04_order_26290.pdf |2019, September 4: order}}
 +
 +{{ :h123:h-123_2019-08-27_eversource_revised_attachment.pdf |2019, August 27: revised attachment}}
 +
 +{{ :h123:h-123_019-06-28_staff_recommendation.pdf |2019, June 28: staff recommendation}}
  
 {{ ::h123_petition.pdf |2019, February 9; E$  petition for crossing Merrimack River; Shield Wire: 7#8 Alumoweld, Transmission Wire: 795 kcmil ACSR 36/1, ADSS Wire: ADSS 72 Fiber}} {{ ::h123_petition.pdf |2019, February 9; E$  petition for crossing Merrimack River; Shield Wire: 7#8 Alumoweld, Transmission Wire: 795 kcmil ACSR 36/1, ADSS Wire: ADSS 72 Fiber}}
  
-{{ ::h123_diagrams.pdf |2019, January 11: exhibits for petition}}+{{ ::h123_diagrams.pdf |2019, February 9: exhibits for petition}}
  
 {{ ::h-123_epa_reports.pdf |2018, December; EPA reports}} {{ ::h-123_epa_reports.pdf |2018, December; EPA reports}}
Line 41: Line 49:
 {{ ::k165_p145_.pdf |2016, January 7: TCA approval, apparently reliability}} {{ ::k165_p145_.pdf |2016, January 7: TCA approval, apparently reliability}}
  
 +{{ :h123:k-165_h-123_order_2012-03-08_order_no_25_333_nisi_granting_license.pdf |2012, March 8: Order Nisi; The project proposed in PSNH’s petition will entail the installation of a new 115kV transmission line (the H 123 Line) and the removal and replacement of a segment of an existing 115kV transmission line (the K165 Line).}}
  
 {{ :h123:h-123_exhibit_2011-11-30_psnh_appendix_a-exhibits_1_and_2.pdf |2011, November 30: crossing exhibits}} {{ :h123:h-123_exhibit_2011-11-30_psnh_appendix_a-exhibits_1_and_2.pdf |2011, November 30: crossing exhibits}}
  
 {{ ::k-165_and_or_h-123_pole_diagram_2011-11-30_psnh_diagrams-figures_1_and_2.pdf |2011, November 30: structure diagrams}} {{ ::k-165_and_or_h-123_pole_diagram_2011-11-30_psnh_diagrams-figures_1_and_2.pdf |2011, November 30: structure diagrams}}
h-123.1713093100.txt.gz · Last modified: 2024/04/14 07:11 by sigridundset