 H-137   Not on June 2023 Asset Condition Project list H-137   Not on June 2023 Asset Condition Project list
  
-{{ ::h137:aot2376_rm.pdf |} 
  
-}{{ ::h137:aot_stamped.pdf |}}+{{ :may_18_2023_e_pac_lines_map.png?linkonly |2023, May 18: map showing line location}}
  
-{{ ::h137:aot_stamped-5.pdf |}}+{{ :draft_project_list_presentation-oct_2023.pdf |2023, October: ES Draft presentation to PAC}} 
 + 
 +{{ ::c-189_g146_h137_m108_maps.pdf |August 2, 2023 environmental resources maps}}
  
 {{ :a05_2023_06_15_pac_laminated_wood_structure_replacements_phase_3.pdf |June 15, PAC presentation}} {{ :a05_2023_06_15_pac_laminated_wood_structure_replacements_phase_3.pdf |June 15, PAC presentation}}
  
-{{ ::c-189_g146_h137_m108_maps.pdf |August 2, 2023 project maps}}+{{ :c189:m108_-_h137_-_c189_-_g146_start_of_construction_form.pdf |2023, May 22: Start of Construction form}} 
 + 
 +{{ ::c189_-_m108_-_h137_-_g146_des_permit_with_waivers.pdf |2023, May 22: DES permit waiving 
 +specific requirements of Env-Wq 1503.21(d)(6 & 7) and Env-Wq 1504.09, }} 
 + 
 +{{ ::c189_g146_m137_m108_5-22-2023.pdf |2023, May 22: Environmental Resources permitting maps}} 
 + 
 +{{ :c189:m108_-_h137_-_c189_-_g146_aot_application_checklist.pdf |2023, February 1: AoT application checklist}} 
 + 
 +{{ :c189:c189_-_m108_-_h137_-_g146_aot_application.pdf |2023, January 27: AoT application}} 
 + 
 +{{ ::h137:aot_stamped.pdf |2022 October 7: alteration of terrain stamped page}} 
 + 
 +{{ ::h137:aot_stamped-5.pdf |2022 August 12: permitting map set stamped}} 
 + 
 +{{ :p145:p145_-_c189_-_m180_-_h137_f_g_email.pdf |2022, October 3: Fish and Game email}} 
 + 
 +{{ :p145:p145_-_h137_-_m108_-_c189_aot_amended_application.pdf |2022, September 17:Amended AOT application}} 
 + 
 +{{ :p145:p145_h137_m108_c189_aot_9-8-2022.pdf |2022, September 8: Alteration of Terrain application}} 
 + 
 +{{ :p145:p145_h137_m108_c189_aot_cover_8-12-2022.pdf |2022, August 12: AOT cover }} 
 + 
 +{{ :p145:p145_h137_m108_c189_permitting_map_set_8-12-2022.pdf |2022, August 12 permitting maps set}} 
 + 
 +{{ :p145:p145_-_h137_-_m108_-_c189_des_permit_with_waivers.pdf |2022, August 12: DES permit with waivers for  Env-Wq 1503.12(d)(1&2)Env-Wq 1503.21(d)(6&7), and Env-Wq 1504.09,}} 
 + 
 +{{ ::c196_-_m108_-_h137_-_g146_wildlife_protection_plan.pdf |2023, April 28: Wildlife protection plan}} 
 + 
 +{{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending}}
  
 +{{ ::k165_p145_.pdf |2016, January 7: TCA approval, apparently reliability}}
  
 +{{ :h137:h-137_proposed_reliability_rebuild_10-2012.png?linkonly |2012, October, Proposed reliability rebuild}}
h-137.1693990266.txt.gz · Last modified: 2023/09/06 04:51 by sigridundset