j-114

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
j-114 [2023/10/21 06:20] sigridundsetj-114 [2024/04/06 09:29] (current) sigridundset
Line 1: Line 1:
-J-114+====== J-114 ====== 
 + 
 +{{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} 
 + 
 +{{ :j114:aot-2407_plans_approved_stamp.pdf |2023, June 27: Alteration of Terrain stamped first page}}
  
 {{ ::j114_piscataquog_lac.pdf |2023, June 20: Piscataquog Local Advisory Committee meeting agenda}} {{ ::j114_piscataquog_lac.pdf |2023, June 20: Piscataquog Local Advisory Committee meeting agenda}}
Line 6: Line 10:
 specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7), and Env-Wq 1504.09,}} specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7), and Env-Wq 1504.09,}}
  
-{{ ::j114_aot_receipt_checklist.pdf |2023, May 9: AoT checklist}}+{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}
  
-{{ ::j114_environmental_resources_map_4-5-2023.pdf |2023, April 5: Environmental Resources map}}+{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 32 out of 49 structures and reconductor with Optical Ground Wire (OPGW); $9.7 million}}
  
-{{ ::j114_env_res_approval_page_4-5-2023.pdf |2023, April 5: Approval of }}+{{ :j114:prlac_5_16_23_minutes_june_agenda-1.pdf |2023, May 16th, PRLAC June Agenda}}
  
-{{ ::j114:aot2407_rm.pdf |DES permits Alteration of Terrain with waivers}}+{{ ::j114_aot_receipt_checklist.pdf |2023, May 9: AoT checklist}}
  
-{{ :j114:aot-2407_plans.pdf |Alteration of Terrain Plans}}+{{ ::j114_environmental_resources_map_4-5-2023.pdf |2023, April 5: Environmental Resources map, GZA}}
  
-{{ :j114:aot-2407_plans_approved_stamp.pdf |Alteration of Terrain stamped first page}}+{{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending}}
  
-{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}+{{ :j114:j-114_2-24-23_license.pdf |2023, February 24: license to cross}}
  
-{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 32 out of 49 structures and reconductor with Optical Ground Wire (OPGW); $9.7 million}}+{{ :j114:staff-recommendation.pdf |2023, February 22: staff recommendation;  the existing static wire will be replaced with a new OPGW wire and the installation of a second OPGW wire. The existing phase conductors will remain unchanged.}}
  
-{{ :j114:prlac_5_16_23_minutes_june_agenda-1.pdf |2023, May 16thPRLAC June Agenda}}+{{ :j114:crossing_application_j114.pdf |2023, February 16: petition for crossing Piscataqua River and State lands; structure replacement and optical ground wire replacement and addition of a second optical ground wire}} 
 + 
 +{{ :j114:j114_exhibits.pdf |2022, November 4: crossing exhibits; 48 fiber.646 OPGW, 144 fiber .646 OPGW, 795 ASCR 36/1 Coot}} 
 + 
 +{{::j114:j-114_proposed_reliability_upgrade_10-2012.png?linkonly|2012, Octoberproposed reliability upgrade}}