j-114

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
j-114 [2023/10/21 06:24] sigridundsetj-114 [2024/04/06 09:29] (current) sigridundset
Line 1: Line 1:
-J-114+====== J-114 ====== 
 + 
 +{{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} 
 + 
 +{{ :j114:aot-2407_plans_approved_stamp.pdf |2023, June 27: Alteration of Terrain stamped first page}}
  
 {{ ::j114_piscataquog_lac.pdf |2023, June 20: Piscataquog Local Advisory Committee meeting agenda}} {{ ::j114_piscataquog_lac.pdf |2023, June 20: Piscataquog Local Advisory Committee meeting agenda}}
Line 5: Line 9:
 {{ ::j114_des_permit_with_waivers.pdf |2023, June 21: DES permit waiving {{ ::j114_des_permit_with_waivers.pdf |2023, June 21: DES permit waiving
 specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7), and Env-Wq 1504.09,}} specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7), and Env-Wq 1504.09,}}
 +
 +{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}
 +
 +{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 32 out of 49 structures and reconductor with Optical Ground Wire (OPGW); $9.7 million}}
 +
 +{{ :j114:prlac_5_16_23_minutes_june_agenda-1.pdf |2023, May 16th, PRLAC June Agenda}}
  
 {{ ::j114_aot_receipt_checklist.pdf |2023, May 9: AoT checklist}} {{ ::j114_aot_receipt_checklist.pdf |2023, May 9: AoT checklist}}
Line 10: Line 20:
 {{ ::j114_environmental_resources_map_4-5-2023.pdf |2023, April 5: Environmental Resources map, GZA}} {{ ::j114_environmental_resources_map_4-5-2023.pdf |2023, April 5: Environmental Resources map, GZA}}
  
-{{ :j114:aot-2407_plans.pdf |Alteration of Terrain Plans}}+{{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending}}
  
-{{ :j114:aot-2407_plans_approved_stamp.pdf |Alteration of Terrain stamped first page}}+{{ :j114:j-114_2-24-23_license.pdf |2023, February 24: license to cross}}
  
-{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building bridge to nowhere.” "}}+{{ :j114:staff-recommendation.pdf |2023, February 22: staff recommendation;  the existing static wire will be replaced with new OPGW wire and the installation of a second OPGW wire. The existing phase conductors will remain unchanged.}}
  
-{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 32 out of 49 structures and reconductor with Optical Ground Wire (OPGW)$9.7 million}}+{{ :j114:crossing_application_j114.pdf |2023, February 16: petition for crossing Piscataqua River and State landsstructure replacement and optical ground wire replacement and addition of a second optical ground wire}}
  
-{{ :j114:prlac_5_16_23_minutes_june_agenda-1.pdf |2023May 16thPRLAC June Agenda}}+{{ :j114:j114_exhibits.pdf |2022, November 4: crossing exhibits; 48 fiber.646 OPGW, 144 fiber .646 OPGW, 795 ASCR 36/1 Coot}} 
 + 
 +{{::j114:j-114_proposed_reliability_upgrade_10-2012.png?linkonly|2012Octoberproposed reliability upgrade}}