| {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} |
| |
{{ :j114:aot-2407_plans_approved_stamp.pdf |2023, June 27: Alteration of Terrain stamped first page}} | {{ :j114:aot-2407_plans_approved_stamp.pdf |2023, June 27: Alteration of Terrain stamped first page}} |
{{ :j114:staff-recommendation.pdf |2023, February 22: staff recommendation; the existing static wire will be replaced with a new OPGW wire and the installation of a second OPGW wire. The existing phase conductors will remain unchanged.}} | {{ :j114:staff-recommendation.pdf |2023, February 22: staff recommendation; the existing static wire will be replaced with a new OPGW wire and the installation of a second OPGW wire. The existing phase conductors will remain unchanged.}} |
| |
{{ :j114:crossing_application_j114.pdf |2023, February 16: petition for crossing; structure replacement and optical ground wire replacement and addition of a second optical ground wire}} | {{ :j114:crossing_application_j114.pdf |2023, February 16: petition for crossing Piscataqua River and State lands; structure replacement and optical ground wire replacement and addition of a second optical ground wire}} |
| |
{{ :j114:j114_exhibits.pdf |2022, November 4: crossing exhibits; 48 fiber.646 OPGW, 144 fiber .646 OPGW, 795 ASCR 36/1 Coot}} | {{ :j114:j114_exhibits.pdf |2022, November 4: crossing exhibits; 48 fiber.646 OPGW, 144 fiber .646 OPGW, 795 ASCR 36/1 Coot}} |
| |
{{::j114:j-114_proposed_reliability_upgrade_10-2012.png?linkonly|2012, October, proposed reliability upgrade}} | {{::j114:j-114_proposed_reliability_upgrade_10-2012.png?linkonly|2012, October, proposed reliability upgrade}} |