User Tools

Site Tools


j-125

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
j-125 [2024/04/12 01:39] sigridundsetj-125 [2024/11/22 08:06] (current) sigridundset
Line 1: Line 1:
 ====== J-125 ====== ====== J-125 ======
  
 +{{ ::eversource_2024_lsp_a.pdf |2024, November 20: Local System Plan, proposed}}
 +
 +{{:j125:j-125_aot_area.png?linkonly|2024, Jul 17: AoT impacts 40 acres}}
 +
 +{{ :j125:j-125_eversource_height_variance_j125_m127_corridors.pdf |2024, April 10: Eversource request to Franklin for variance from 50' height limit for transmission structures: }}
  
 {{ ::2023_11_15_topac_lsp_eversource_presentation.pdf |2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC}} {{ ::2023_11_15_topac_lsp_eversource_presentation.pdf |2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC}}
  
-{{ ::j125:24271e.pdf |}}+{{ :j125:j125-introduction-letter.pdf |2023, June 15: "Dear Neighbor" Letter}} 
 + 
 +{{ :j125:j-125_cr-2021-013-order-of-notice.pdf |2021, order of notice}} 
 + 
 +{{ :j125:j-125_2021-06-21_staff_rec.pdf |2021, June 21: staff recommendation}} 
 + 
 +{{ :j125:j-125_21-094_2021-05-06_eversource_crossing_petition_belmont.pdf |2021, May 6: petition for crossing Lake Winnisquam;  795 ASCR 26/7 Drake conductors, one static line and one OPGW remain the same. Brugg 571 12 fiber OPGW, 7#8 Alumoweld, }} 
 + 
 +{{ :j125:j-125_21-094_2021-05-06_eversource_att_crossing_petition_belmont_with_older_exhibits.pdf |2021, May 6: petition for crossing exhibit and older exhibits with (2) 7#8 Alumoweld and 796 ASCR 26/7 Drake}} 
 + 
 +{{ ::j125:24271e.pdf |2004, January 39: Order Nisi; crossings of Pemigewasset River in the City of Franklin, the Winnipesaukee River in the Towns of Tilton and Belmont, and Lake Winnisquam in the Town of Belmont, New Hampshire.}} 
 + 
 +2002: petition for crossing four water bodies below 
 + 
 +4/21/1976: Order for crossing of Pemigewasset River, DE 76-22 (Order No. 12,219)    
 +     
 +8/4/1975:  Order for crossing of Ephraim’s Cove,  DE 75-149 (Order No. 11,949) 
 + 
 +6/16/1976: order for crossing of Winnisquam (Ephraim’s Bay) and Winnepesaukee,  DE 75-156 (order 11,949) 
 + 
 +8/31/1955: crossing of Lake Winnisquam, Docket D-E3442 (Order No. 6,668,)
  
-{{ ::j125:cr-2021-013-order-of-notice.pdf |}}+5/23/1938license from B&M Railroad under a pole and wire agreement, for rail-bed crossing in Tilton 
j-125.1712900340.txt.gz · Last modified: 2024/04/12 01:39 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki