Both sides previous revisionPrevious revisionNext revision | Previous revision |
l-176 [2024/04/10 08:58] – sigridundset | l-176 [2024/04/28 05:23] (current) – sigridundset |
---|
====== L-176 ====== | ====== L-176 ====== |
| |
Webster to Laconia | Webster to Laconia, reliability? |
| |
| |
| |
| |
{{ :l-176:l-176_opgw_added_2019-10-07_eversource_att_notification_alteration_belmont_tilton.pdf |2019, | {{ :l-176:l-176_opgw_added_2019-10-07_eversource_att_notification_alteration_belmont_tilton.pdf |2019, |
October 7: notification of altertion, exhibits}} | October 7: notification of alteration, exhibit 2}} |
| |
{{ :l-176:l-176_2019_frak_out_risk_2019-04-05_eversource_proposed_alteration_lakewinni_welch_island.pdf |2019, April 5: Frak-out risk proposed alternative, Lake Winnipesaukee}} | {{ :l-176:l-176_2019_frak_out_risk_2019-04-05_eversource_proposed_alteration_lakewinni_welch_island.pdf |2019, April 5: "Amended petition for crossing; "as a result of concerns raised by our HDD contractors relating to the type of soils to be encountered, and the higher risk of a "frack out" which could result in an undesirable release of drilling fluids into the waters of the Lake, an engineering and environmental determination has been made to use conventional trenching methods for the Belknap Point shoreline installation, instead of HDD. Please note that the use of conventional trenching on the Welch Island shoreline was always planned and is not being altered}} |
| |
| {{ :l-176:l-176_2018-10-25_order_26181_summary.pdf |2018, October 25: Order summary}} |
| |
| {{ :l-176:l-176_2018-10-25_order_26181.pdf |2018, October 25: Order}} |
| |
{{ :l-176:l-176_2018-10-05_staff_rec.pdf |2018, October 5: staff recommendation}} | {{ :l-176:l-176_2018-10-05_staff_rec.pdf |2018, October 5: staff recommendation}} |
| |
{{ :l-176:l-176_2018-07-09_staff_memo_rec.pdf |2018, July 9: staff recommendation}} | {{ :y170:y-170_2018_.pdf |2018, August 24: Order Nisi}} |
| |
{{ :l-176:l-176_2018-05-10_eversource_petition_crossings_belmont_tilton_laconia.pdf |2018, April 10: petition for crossings, Belmont, Tilton, Laconia}} | {{ :l-176:l-176_2018-07-09_staff_memo_rec.pdf |2018, July 9: staff recommendation; "This is a rebuild of existing lines for a capital reliability project. ES’s existing L176 transmission line and the 398 line are not being relocated as result of this project but rather rebuilt with the existing conductors"}} |
| |
| {{ :l-176:l-176_2018-05-10_eversource_petition_crossings_belmont_tilton_laconia.pdf |2018, April 10: petition for crossings, Belmont, Tilton, Laconia. "Certain of the existing Ll 76 wood transmission line |
| structures and associated distribution components are approximately 40 years old, have been subject to woodpecker and other environmental damage, and require replacement or modification for the lines to continue to function safely and reliably. This structure replacement and repair project is part of a capital reliability project necessary for the Ll 76 transmission line to continue to meet current as well as future projected electricity demands."}} |
| |
{{ :l-176:l-176_2018-05-10_eversource_att_petition_crossings_belmont_tilton_laconia.pdf |2018, May 10: petition for crossing, exhibits}} | {{ :l-176:l-176_2018-05-10_eversource_att_petition_crossings_belmont_tilton_laconia.pdf |2018, May 10: petition for crossing, exhibits}} |
| |
{{ :l-176:l-176_2018-04-30_eversource_petition_crossing_winni_river_belmont_tilton.pdf |2018, April 30: application for crossing Winnipesaukee River, Belmont and Tilton}} | {{ :l-176:l-176_2018-04-30_eversource_petition_crossing_winni_river_belmont_tilton.pdf |2018, April 30: application for crossing Winnipesaukee River, Belmont and Tilton; "This existing crossing has been |
| previously licensed by the Commission under Order No. 11,949, dated August 4, 1975, issued in Docket DE 75-149."}} |
| |
{{ ::l-176:l-176_prlac_minutes.2017-07-25.pdf |2017, July 25: Pemigewasset River Local Advisory Committee, minutes, problems with L-176 construction}} | {{ ::l-176:l-176_prlac_minutes.2017-07-25.pdf |2017, July 25: Pemigewasset River Local Advisory Committee, minutes, problems with L-176 construction}} |
| |
| {{ :l-176:prlac_agenda_7-25-17.pdf |2017, July 25: PRLAC agenda}} |
| |
| |