 Webster to Laconia, reliability? Webster to Laconia, reliability?
 +
 +
  
  
Line 9: Line 11:
  
 {{ :l-176:l-176_opgw_added_2019-10-07_eversource_att_notification_alteration_belmont_tilton.pdf |2019,  {{ :l-176:l-176_opgw_added_2019-10-07_eversource_att_notification_alteration_belmont_tilton.pdf |2019, 
-October 7: notification of altertion, exhibit 2}}+October 7: notification of alteration, exhibit 2}}
  
 {{ :l-176:l-176_2019_frak_out_risk_2019-04-05_eversource_proposed_alteration_lakewinni_welch_island.pdf |2019, April 5: "Amended petition for crossing; "as a result of concerns raised by our HDD contractors relating to the type of soils to be encountered, and the higher risk of a "frack out" which could result in an undesirable release of drilling fluids into the waters of the Lake, an engineering and environmental determination has been made to use conventional trenching methods for the Belknap Point shoreline installation, instead of HDD. Please note that the use of conventional trenching on the Welch Island shoreline was always planned and is not being altered}} {{ :l-176:l-176_2019_frak_out_risk_2019-04-05_eversource_proposed_alteration_lakewinni_welch_island.pdf |2019, April 5: "Amended petition for crossing; "as a result of concerns raised by our HDD contractors relating to the type of soils to be encountered, and the higher risk of a "frack out" which could result in an undesirable release of drilling fluids into the waters of the Lake, an engineering and environmental determination has been made to use conventional trenching methods for the Belknap Point shoreline installation, instead of HDD. Please note that the use of conventional trenching on the Welch Island shoreline was always planned and is not being altered}}
 +
 +{{ :l-176:l-176_2018-10-25_order_26181_summary.pdf |2018, October 25: Order summary}}
 +
 +{{ :l-176:l-176_2018-10-25_order_26181.pdf |2018, October 25: Order}}
  
 {{ :l-176:l-176_2018-10-05_staff_rec.pdf |2018, October 5: staff recommendation}} {{ :l-176:l-176_2018-10-05_staff_rec.pdf |2018, October 5: staff recommendation}}
 +
 +{{ :y170:y-170_2018_.pdf |2018, August 24: Order Nisi}}
  
 {{ :l-176:l-176_2018-07-09_staff_memo_rec.pdf |2018, July 9: staff recommendation; "This is a rebuild of existing lines for a capital reliability project. ES’s existing L176 transmission line and the 398 line are not being relocated as result of this project but rather rebuilt with the existing conductors"}} {{ :l-176:l-176_2018-07-09_staff_memo_rec.pdf |2018, July 9: staff recommendation; "This is a rebuild of existing lines for a capital reliability project. ES’s existing L176 transmission line and the 398 line are not being relocated as result of this project but rather rebuilt with the existing conductors"}}