-M-108 aka V-182 Not on June 2023 Asset Condition List+====== M-108 aka V-182 Not on June 2023 Asset Condition List ======
  
-{{ ::g-146_and_m-108.pdf |2023, February 13Pembroke CC minutes"replacement of 65 existing wooden pole structures with significantly larger weathered-steel structures...Roads through these easements will require significant improvementincluding the permanent placement of gravel along the roadbed...Additionally100’x100’ gravel work pads will be constructed at each pole location. After completion of the project 60’x30’ pads will be left at each of these sites."}}+{{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} 
 + 
 +{{ :draft_project_list_presentation-oct_2023.pdf |2023, OctoberES Draft presentation to PAC}} 
 + 
 +{{ ::c-189_g146_h137_m108_maps.pdf |August 22023 Environmental Resources maps}} 
 + 
 +{{ :v182:transmittal_final_documents_re_external_v182_f139_transmission_line_rebuild_project.pdf |2023June 5; email with AoT links}}
  
-{{ ::c-189_g146_h137_m108_maps.pdf |August 2, 2023 project maps}}+{{ :v182:aot2388_rm.pdf |2023, May 29: DES AoT permit waiving specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(c)(2), and Env-Wq 1504.09,}}
  
-{{ :v182:aot2388_rm.pdf |2023, May 29DES AoT permit waiving +{{ :c189:m108_-_h137_-_c189_-_g146_start_of_construction_form.pdf |2023, May 22Start of Construction form}}
-specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(c)(2), and Env-Wq 1504.09,}}+
  
 {{ ::c189_-_m108_-_h137_-_g146_des_permit_with_waivers.pdf |2023, May 22: DES permit waiving {{ ::c189_-_m108_-_h137_-_g146_des_permit_with_waivers.pdf |2023, May 22: DES permit waiving
 specific requirements of Env-Wq 1503.21(d)(6 & 7) and Env-Wq 1504.09, }} specific requirements of Env-Wq 1503.21(d)(6 & 7) and Env-Wq 1504.09, }}
  
-{{ ::c189_g146_m137_m108_5-22-2023.pdf |2023, May 22: Environmental Resources permitting maps}}+{{ ::c189_g146_m137_m108_5-22-2023.pdf |2023, May 22: Environmental Resources permit map set}}
  
 {{ ::c196_-_m108_-_h137_-_g146_wildlife_protection_plan.pdf |2023, April 28: Wildlife protection plan}} {{ ::c196_-_m108_-_h137_-_g146_wildlife_protection_plan.pdf |2023, April 28: Wildlife protection plan}}
Line 18: Line 23:
  
 {{ :v182:aot-2388_nhfg_conditions.pdf |2023, March 23: New Hampshire Fish & Game conditions}} {{ :v182:aot-2388_nhfg_conditions.pdf |2023, March 23: New Hampshire Fish & Game conditions}}
 +
 +{{ ::m108:license.pdf |2023, March 7: license to cross; Structures 2,11,12,27, and 29 through 32 replaced. "The Ml08's existing three phase conductors, single OPGW wire, and single static wire...will not be changed in the course of performing the steel structure
 +replacements.}}
 +
 +{{ ::m108:staff-recommendation.pdf |2023, March 3: staff recommendation}}
 +
 +{{ ::m108:application.pdf |2023, February 23: petition to cross Merrimack River and Soucook River }}
 +
 +{{ ::m108:exhibits_1-7.pdf |2022, June 29: crossing exhibit, 1590 ASCR  45/7, 24 fiber OPGW .646" Brugg 93AY68ACS}}
 +
 +{{ ::g-146_and_m-108.pdf |2023, February 13: Pembroke CC minutes: "replacement of 65 existing wooden pole structures with significantly larger weathered-steel structures...Roads through these easements will require significant improvement, including the permanent placement of gravel along the roadbed...Additionally, 100’x100’ gravel work pads will be constructed at each pole location. After completion of the project 60’x30’ pads will be left at each of these sites."}}
 +
 +{{ :c189:m108_-_h137_-_c189_-_g146_aot_application_checklist.pdf |2023, February 1: AoT application checklist}}
 +
 +{{ :c189:c189_-_m108_-_h137_-_g146_aot_application.pdf |2023, January 27: AoT application}}
  
 {{ :p145:p145_-_c189_-_m180_-_h137_f_g_email.pdf |2022, October 3: Fish and Game email}} {{ :p145:p145_-_c189_-_m180_-_h137_f_g_email.pdf |2022, October 3: Fish and Game email}}
Line 26: Line 46:
  
 {{ :p145:p145_h137_m108_c189_aot_9-8-2022.pdf |2022, September 8: Alteration of Terrain application}} {{ :p145:p145_h137_m108_c189_aot_9-8-2022.pdf |2022, September 8: Alteration of Terrain application}}
 +
 +{{ :v182:transmittal_of_final_documents_re_external_v182_transmission_line.pdf |2022, August 25: email with AoT links}}
  
 {{ :v182:aot_stamped-5.pdf |2022, August 12: first page AoT permit, stamped }} {{ :v182:aot_stamped-5.pdf |2022, August 12: first page AoT permit, stamped }}
Line 36: Line 58:
  
 {{ :p145:p145_-_h137_-_m108_-_c189_des_permit_with_waivers.pdf |2022, August 12: DES permit with waivers for  Env-Wq 1503.12(d)(1&2), Env-Wq 1503.21(d)(6&7), and Env-Wq 1504.09,}} {{ :p145:p145_-_h137_-_m108_-_c189_des_permit_with_waivers.pdf |2022, August 12: DES permit with waivers for  Env-Wq 1503.12(d)(1&2), Env-Wq 1503.21(d)(6&7), and Env-Wq 1504.09,}}
 +
 +{{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending}}
  
 {{ :v182:aot_stamped-3.pdf |2022, May 13; first page Alteration of Terrain, stamped}} {{ :v182:aot_stamped-3.pdf |2022, May 13; first page Alteration of Terrain, stamped}}
Line 54: Line 78:
  
 {{ :v182:m108_v182_puc.pdf |2022, March 23: petition for crossing}} {{ :v182:m108_v182_puc.pdf |2022, March 23: petition for crossing}}
- 
-{{ :v182:transmittal_final_documents_re_external_v182_f139_transmission_line_rebuild_project.pdf |2023, June 5; email with AoT links}} 
- 
-{{ :v182:transmittal_of_final_documents_re_external_v182_transmission_line.pdf |}} 
  
 {{ ::np_v182_f139.pdf |2016: Northern Pass F-139 and V-182}} {{ ::np_v182_f139.pdf |2016: Northern Pass F-139 and V-182}}