====== M-108 aka V-182 Not on June 2023 Asset Condition List ====== | ====== M-108 aka V-182 Not on June 2023 Asset Condition List ====== |
| |
| {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} |
| |
{{ :draft_project_list_presentation-oct_2023.pdf |2023, October: ES Draft presentation to PAC}} | {{ :draft_project_list_presentation-oct_2023.pdf |2023, October: ES Draft presentation to PAC}} |
{{ ::m108:application.pdf |2023, February 23: petition to cross Merrimack River and Soucook River }} | {{ ::m108:application.pdf |2023, February 23: petition to cross Merrimack River and Soucook River }} |
| |
{{ ::m108:exhibits_1-7.pdf |}} | {{ ::m108:exhibits_1-7.pdf |2022, June 29: crossing exhibit, 1590 ASCR 45/7, 24 fiber OPGW .646" Brugg 93AY68ACS}} |
| |
{{ ::g-146_and_m-108.pdf |2023, February 13: Pembroke CC minutes: "replacement of 65 existing wooden pole structures with significantly larger weathered-steel structures...Roads through these easements will require significant improvement, including the permanent placement of gravel along the roadbed...Additionally, 100’x100’ gravel work pads will be constructed at each pole location. After completion of the project 60’x30’ pads will be left at each of these sites."}} | {{ ::g-146_and_m-108.pdf |2023, February 13: Pembroke CC minutes: "replacement of 65 existing wooden pole structures with significantly larger weathered-steel structures...Roads through these easements will require significant improvement, including the permanent placement of gravel along the roadbed...Additionally, 100’x100’ gravel work pads will be constructed at each pole location. After completion of the project 60’x30’ pads will be left at each of these sites."}} |