User Tools

Site Tools


media_articles

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
media_articles [2024/02/05 02:36] sigridundsetmedia_articles [2024/04/20 10:12] (current) sigridundset
Line 1: Line 1:
 ====== Media Articles ====== ====== Media Articles ======
  
-[[https://www.utilitydive.com/news/eversource-national-grid-iso-new-england-ferc-asset-condition-transmission-maine/706393/ |2024, February 2; Utility Dive, "Eversource, others may be capitalizing on lax reviews for some transmission projects: Maine officials"]+[[https://www.utilitydive.com/news/eversource-national-grid-iso-new-england-ferc-asset-condition-transmission-maine/706393/|2024, February 2; Utility Dive, "Eversource, others may be capitalizing on lax reviews for some transmission projects: Maine officials"]
 + 
 +{{ :ac:me_advocate_protest_w-attachments.pdf |2024, January 31: Maine Advocate complaint to FERC re. asset condition projects}}
  
 {{ ::20240108-5192_harvard_eli_ad21-15_comment_-_jan_8_2024.pdf |2024, January 8: Ari Peskoe letter to FERC re.  Joint Federal-State Task Force on Electric Transmission}} {{ ::20240108-5192_harvard_eli_ad21-15_comment_-_jan_8_2024.pdf |2024, January 8: Ari Peskoe letter to FERC re.  Joint Federal-State Task Force on Electric Transmission}}
Line 18: Line 20:
  
 [[https://indepthnh.org/2023/07/14/op-ed-northern-pass-lite-phase-i/|2023, July 14: InDepthNH, same article printed in NHBR]] [[https://indepthnh.org/2023/07/14/op-ed-northern-pass-lite-phase-i/|2023, July 14: InDepthNH, same article printed in NHBR]]
 +
 +[[https://www.utilitydive.com/news/FERC-independent-transmission-monitor-itm-Southern-Company/633592/| 2022, October 7: Utility Dive "About 63% of transmission investment in California over the last three years was on “repair and replacement” projects that are self-approved by the state’s three major investor-owned utilities."]]
 +
 +{{ :ac:wired_group_asset_condition_problem_2.pdf |2020, September: Wired Group 2}}
 +
 +{{ :ac:asset_condition_problem_wired_group.pdf |2020, August: Wired Group}}
 +
 +[[https://www.cleveland.com/opinion/2017/12/to_avoid_skyrocketing_electric.html| 2017, December 31: Cleveland Opinion. To Avoid Skyrocketing Electric Costs FERC scrutiny of 'supplemental' projects is needed]]
 +
 +
  
media_articles.1707118576.txt.gz · Last modified: 2024/02/05 02:36 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki