User Tools

Site Tools


o-154

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
o-154 [2024/04/04 05:32] sigridundseto-154 [2024/11/22 08:07] (current) sigridundset
Line 1: Line 1:
 O-154 115kV line O-154 115kV line
 +
 +{{ ::eversource_2024_lsp_a.pdf |2024, November 20: Local System Plan, in-service, $35 m.}}
  
 {{ ::2023_11_15_topac_lsp_eversource_presentation.pdf |2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC}} {{ ::2023_11_15_topac_lsp_eversource_presentation.pdf |2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC}}
 +
 +{{ ::o154:0154.pdf |2023, September 20: DES acknowledges Eversource withdrawal of wetlands application}}
  
 {{ ::local-system-plan.pdf |2022, October 19: 2019 local system plan E$-presentation to PAC}} {{ ::local-system-plan.pdf |2022, October 19: 2019 local system plan E$-presentation to PAC}}
Line 39: Line 43:
 {{ ::petition._o-154.pdf |2021, January 3; E$ petition for crossing}} {{ ::petition._o-154.pdf |2021, January 3; E$ petition for crossing}}
  
-{{ ::petition-attachments_o-154.pdf |2021 petition attachments showing structures exceeding required clearance by 6'-13'}}+{{ ::petition-attachments_o-154.pdf |2021 petition attachments showing structures exceeding required clearance by 6'-18'}}
  
 {{ :a7_eversource_lsp.pdf |2019, October 24: PAC local system plan, E$ presentation to PAC}} {{ :a7_eversource_lsp.pdf |2019, October 24: PAC local system plan, E$ presentation to PAC}}
o-154.1712223122.txt.gz · Last modified: 2024/04/04 05:32 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki