====== Project Plans ====== | ====== Project Plans ====== |
| |
| ===== Basic project plansheets and structure height changes removed from Eversource "site" some time around mid-April, 2025 ===== |
| |
| |
{{ :x178:project_information_form_-_reel_brook_trail_kinsman_ridge_trail_relocations.pdf |2025, April: Re-routing of Reel Brook Trail, apparently around the existing trail which Eversource plans to turn into a road with two cross-roads, to access the X-178}} | {{ :x178:project_information_form_-_reel_brook_trail_kinsman_ridge_trail_relocations.pdf |2025, April: Re-routing of Reel Brook Trail, apparently around the existing trail which Eversource plans to turn into a road with two cross-roads, to access the X-178}} |
{{ :x178:2024-12-23_kp_comment_on_eversource_waivers_from_permit_requirements.pdf |December 23: Eversource waivers from DES permit requirements}} | {{ :x178:2024-12-23_kp_comment_on_eversource_waivers_from_permit_requirements.pdf |December 23: Eversource waivers from DES permit requirements}} |
| |
| {{ :x178:x-178_boring_plan.pdf |2025, January 20: Statutory Permit by Notification for geotechnical borings of unstated depth on the X-178 easement in White Mountain National Forest."Threats to both the medium level fen system and poor level fen/bog system include changes to hydrology, especially those that result in pooling, increased nutrient input and increased sedimentation." Borings postponed to Q1, 2026}} |
| |
{{ :x178:x-178_boring_plan.pdf |2025, January 20: Statutory Permit by Notification for geotechnical borings of unstated depth on the X-178 easement in White Mountain National Forest."Threats to both the medium level fen system and poor level fen/bog system include changes to hydrology, especially those that result in pooling, increased nutrient input and increased sedimentation."}} | |
| |
{{ :x178:2025-1-19_comment_structure_age.pdf |2025, January 19: Comment on structure age}} | |
| |
{{ :x178:2025-1-18_comment_on_es_application_for_variance_.pdf| 2025, January 18: Comment on Eversource application for a Variance from Easton's structure height restriction}} | |
| |
{{ :x178:easton_variance_application_11-12-24_opt.pdf |2025, January 7: Eversource application for a variance from Easton's structure height restriction.}} | {{ :x178:easton_variance_application_11-12-24_opt.pdf |2025, January 7: Eversource application for a variance from Easton's structure height restriction.}} |
| |
{{ :x178:x178_permitting_plans_wmnf_grading_091224.pdf |2024, September 12: Road Grading White Mountain National Forest}} | {{ :x178:x178_permitting_plans_wmnf_grading_091224.pdf |2024, September 12: Road Grading White Mountain National Forest}} |
| |
| {{ :x178:x178_permitting_plans_phase_2_081224_bog_markings.pdf |2024, August 12: X-178 (2) Phase 2 Permitting Plans}} |
| |
{{ :x178:x178_permitting_plans_phase_2_081224_1_.pdf |2024, August 12: Section 2, Phase 2 maps with 2' lidar-derived contour lines. White Mountain National Forest.}} | {{ :x178:x178_permitting_plans_phase_2_081224_1_.pdf |2024, August 12: Section 2, Phase 2 maps with 2' lidar-derived contour lines. White Mountain National Forest.}} |
{{ :x178:2024-07-23_re_revised_aot_permitting_plans_-_eversource_x178-1_transmission_line_rebuild_project_-_nhdes_file_20240320-60.pdf |2024, July 23: Revised AoT permitting plans}} | {{ :x178:2024-07-23_re_revised_aot_permitting_plans_-_eversource_x178-1_transmission_line_rebuild_project_-_nhdes_file_20240320-60.pdf |2024, July 23: Revised AoT permitting plans}} |
| |
| {{ :x178:wmnf_x178-1_transmission_line_rebuild_project_information_form.pdf |2024, April 2: Eversource Small Projects Day application for line rebuild on Section 1 of X-178, Woodstock.}} |
| |
| {{ :x178:x-178_easton_plans.pdf |2024: Environmental Permitting Planset, Easton, no wetlands scientist stamp.}} |
| |
| {{ :eversource_x-178-2_project_proposal_overview_map.pdf |2023, October: WMNF overview map}} |
| |
| {{ :x178-1-draft-map-set.pdf |2023, July 26: X-178 (1) Draft Map Set}} |
| |
| {{ :x178:x178-3-draft-map-set.pdf |2023, July 26: X-178 (3), Draft Map Set}} |
| |
| {{ :x178:x178-2-draft-map-set_7-25-2023.pdf |2023, July 25: X-178 (2) Draft Map Set}} |
| |
| {{ :x178:x178_spn_plan_compiled-1.pdf |2021, February 18: Transmission line aerial overview plans, GZA}} |
| |
| {{ :x178:x178_spn_plan.pdf |2020, January 30: Aerial overview plan}} |
| |
| |