User Tools

Site Tools


project_plans

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
project_plans [2025/04/29 04:45] sigridundsetproject_plans [2025/04/29 04:52] (current) sigridundset
Line 1: Line 1:
 ====== Project Plans ====== ====== Project Plans ======
  
-Basic project plansheets and structure height changes removed from Eversource "site" some time around mid-April, 2025+===== Basic project plansheets and structure height changes removed from Eversource "site" some time around mid-April, 2025 ===== 
  
 {{ :x178:project_information_form_-_reel_brook_trail_kinsman_ridge_trail_relocations.pdf |2025, April: Re-routing of Reel Brook Trail, apparently around the existing trail which Eversource plans to turn into a road with two cross-roads, to access the X-178}} {{ :x178:project_information_form_-_reel_brook_trail_kinsman_ridge_trail_relocations.pdf |2025, April: Re-routing of Reel Brook Trail, apparently around the existing trail which Eversource plans to turn into a road with two cross-roads, to access the X-178}}
Line 15: Line 16:
 {{ :x178:2024-12-23_kp_comment_on_eversource_waivers_from_permit_requirements.pdf |December 23: Eversource waivers from DES permit requirements}} {{ :x178:2024-12-23_kp_comment_on_eversource_waivers_from_permit_requirements.pdf |December 23: Eversource waivers from DES permit requirements}}
  
-{{ :x178:x-178_boring_plan.pdf |2025, January 20: Statutory Permit by Notification for geotechnical borings of unstated depth on the X-178 easement in White Mountain National Forest."Threats to both the medium level fen system and poor level fen/bog system include changes to hydrology, especially those that result in pooling, increased nutrient input and increased sedimentation."}}+{{ :x178:x-178_boring_plan.pdf |2025, January 20: Statutory Permit by Notification for geotechnical borings of unstated depth on the X-178 easement in White Mountain National Forest."Threats to both the medium level fen system and poor level fen/bog system include changes to hydrology, especially those that result in pooling, increased nutrient input and increased sedimentation." Borings postponed to Q1, 2026}}
  
 {{ :x178:easton_variance_application_11-12-24_opt.pdf |2025, January 7: Eversource application for a variance from Easton's structure height restriction.}} {{ :x178:easton_variance_application_11-12-24_opt.pdf |2025, January 7: Eversource application for a variance from Easton's structure height restriction.}}
Line 34: Line 35:
  
 {{ :x178:x178_permitting_plans_wmnf_grading_091224.pdf |2024, September 12: Road Grading White Mountain National Forest}} {{ :x178:x178_permitting_plans_wmnf_grading_091224.pdf |2024, September 12: Road Grading White Mountain National Forest}}
- 
-{{ :x178:x178-3-draft-map-set.pdf |2023, July 25: X-178 (3), Draft Map Set}} 
- 
-{{ :x178:x178-2-draft-map-set_7-25-2023.pdf |2023, July 25: X-178 (2), Draft Map Set}} 
- 
-{{ :x178:x178-1-draft-map-set_vhb.pdf |}} 
- 
-{{ :x178:x178-2-draft-map-set_7-25-2023.pdf |2023, July 25: X-178 (2) Draft Map Set}} 
  
 {{ :x178:x178_permitting_plans_phase_2_081224_bog_markings.pdf |2024, August 12: X-178 (2) Phase 2 Permitting Plans}} {{ :x178:x178_permitting_plans_phase_2_081224_bog_markings.pdf |2024, August 12: X-178 (2) Phase 2 Permitting Plans}}
Line 63: Line 56:
 {{ :eversource_x-178-2_project_proposal_overview_map.pdf |2023, October: WMNF overview map}} {{ :eversource_x-178-2_project_proposal_overview_map.pdf |2023, October: WMNF overview map}}
  
-{{ :x178-1-draft-map-set.pdf |2023, August 1; Campton, Thornton and Woodstock DRAFT proposed construction plans}}+{{ :x178-1-draft-map-set.pdf |2023, July 26: X-178 (1) Draft Map Set}}
  
-{{ ::x178-2-draft-map-set.pdf |2023, August 1; North Woodstock to Sugar Hill DRAFT proposed construction plans}}+{{ :x178:x178-3-draft-map-set.pdf |2023, July 26: X-178 (3), Draft Map Set}}
  
-{{ ::x178-3-draft-map-set.pdf |2023, August 1; Sugar Hill, Bethlehem, Dalton, Whitefield DRAFT proposed construction plans}}+{{ :x178:x178-2-draft-map-set_7-25-2023.pdf |2023, July 25: X-178 (2) Draft Map Set}}
  
 {{ :x178:x178_spn_plan_compiled-1.pdf |2021, February 18: Transmission line aerial overview plans, GZA}} {{ :x178:x178_spn_plan_compiled-1.pdf |2021, February 18: Transmission line aerial overview plans, GZA}}
project_plans.1745916307.txt.gz · Last modified: 2025/04/29 04:45 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki