User Tools

Site Tools


q-195

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
q-195 [2023/08/15 11:00] sigridundsetq-195 [2024/04/17 06:51] (current) sigridundset
Line 3: Line 3:
 {{ ::2023_05_18_meeting_minutes_final.pdf |2023 May 18 PAC minutes, Replace 224 wood structures with 223 new steel structures, Re-conductor 17.5 miles of 336/477/795 ACSR with 1272 ACSS, Install 35 miles of OPGW (2 x 17.5 mi, Estimated PTF Cost: $100.00M (-25% / +50%), Projected In-service Date: Q4, 2026}} {{ ::2023_05_18_meeting_minutes_final.pdf |2023 May 18 PAC minutes, Replace 224 wood structures with 223 new steel structures, Re-conductor 17.5 miles of 336/477/795 ACSR with 1272 ACSS, Install 35 miles of OPGW (2 x 17.5 mi, Estimated PTF Cost: $100.00M (-25% / +50%), Projected In-service Date: Q4, 2026}}
  
-{{ ::b112-u199-q195_rebuild_presentation.pdf |Line rebuild presentation}}+{{ ::b112-u199-q195_rebuild_presentation.pdf |2023, May 18 presentation to PAC}} 
 + 
 +{{ ::q195_dear_neighbor_letter.pdf |2023, February 28: "Dear Neighbor" letter}} 
 + 
 +{{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending}}
  
 {{ :2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossing poles fine }} {{ :2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossing poles fine }}
 +
 +{{ ::pre-np_multi_line_assertion_of_rights_2017-12-14_eversource_petition_water_crossing.pdf |2017, December 14: assertion of 2015 assertion of crossing rights}}
q-195.1692111648.txt.gz · Last modified: 2023/08/30 07:51 (external edit)

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki