 R-187 115kV line R-187 115kV line
  
 +{{ :r187:article_about_e_asset_condition_projects.pdf |2024, March 15: Article on R-187, X-116, Z-119 and S-188 replacements}}
  
 +{{ :r187:r-187_x-116_z-119_s-188_article.pdf |2023, Octoer 31: Harlan Electric Earns 2023 NECA Project
 +Excellence Award,R-187, X-116, Z-119 and S-188 replacements }}
 +
 +{{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending}}
  
 {{ ::crossing-license-granted_r-187.pdf |2021, December 1; crossing granted}} {{ ::crossing-license-granted_r-187.pdf |2021, December 1; crossing granted}}
Line 15: Line 20:
 {{ ::r187:r-187.jpg?linkonly |pole in good condition being cut down}} {{ ::r187:r-187.jpg?linkonly |pole in good condition being cut down}}
  
-{{ :r187:r-187_2.jpg?linkonly |pole in good condition laying on altered terrain}}+{{ :r187:r-187_pole_stub.jpg?linkonly |pole stub after felling}} 
 + 
 +{{ :r187:r-187_2.jpg?linkonly |pole in good condition laying on altered terrain. "Recent structure replacements have revealed additional concerns about the integrity of laminated wood structures installed between 2000 and 2014"}}
  
 {{ :r187:r-187_felled_4.jpg?linkonly |good condition labeled felled pole}} {{ :r187:r-187_felled_4.jpg?linkonly |good condition labeled felled pole}}
Line 29: Line 36:
 {{ :r187:r-187_psnh.jpg?linkonly PSNH tag|Pole with tag and number}} {{ :r187:r-187_psnh.jpg?linkonly PSNH tag|Pole with tag and number}}
  
-{{ :r187:r-187_pole_stub.jpg?linkonly |pole stub}}+
  
  
  
  