 +The S153 line originates in Stratham and ends in Portsmouth. It shares the easement with the A-126, and a gas line.
  
 {{ :may_18_2023_e_pac_lines_map.png?linkonly |map of project location}} {{ :may_18_2023_e_pac_lines_map.png?linkonly |map of project location}}
  
-{{ :a126:aot-2412_permit_rm.pdf |2023, June 27: Alteration of Terrain permit with waivers}}+{{ :3135:a-126_s-153_3135.pdf |2023, June 3, withdrawn DES permit application for construction}}
  
-{{ :a126:aot-2412_plans.pdf |2023, June 16Alteration of Terrain plans}}+{{ :a126:a124_-_h141_-_s153_start_of_construction_notice.pdf |2023, May 23Start of construction notice}}
  
-{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}+{{ :a126:a_126_-_h141_-_s153_des_permit_with_waivers.pdf |2023, May 21: DES permit with waivers}}
  
-{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 16 out of 51 structures; $5. million}}+{{ :a126:a126_-_h141_-_s153_aot.pdf |2023, May 18: Environmental Resources Map}}
  
-{{ ::2023_05_18_meeting_minutes_final.pdf |2023 may 18 PAC minutes}}+{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}
  
-{{ :r193_-_a121_-_h141_aot_permit_application.pdf |2023, May 5 AoT application}}+{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 16 out of 51 structures; $5. million}}
  
-{{ ::a126:aot-2412_miscellaneous_r.pdf |2023May 5: cover letter for Alteration of Terrain application. "The proposed project includes the replacement of 76 existing utility structures on the R193, A126, and H141 transmission lines that must be replaced because they have reached the end of their service life."}}+{{ ::2023_05_18_meeting_minutes_final.pdf |2023 May 18 PAC minutes}}
  
-{{ ::2023_05_18_meeting_minutes_final.pdf |2023 may 18 PAC minutes}}+{{ ::s153:5-9-2023_a-126_h-141_s-153.pdf |2023, May 9: F&G permit conditions}}
  
-{{ :r193_-_a121_-_h141_aot_permit_application.pdf |2023, May 5 AoT application}}+{{ :a126:a126_-_h141_-_s153_aot_checklist.pdf |2023, April 3: AOT checklist}}
  
-{{ ::a126:aot-2412_miscellaneous_r.pdf |2023, May 5cover letter for Alteration of Terrain application. "The proposed project includes the replacement of 76 existing utility structures on the R193, A126, and H141 transmission lines that must be replaced because they have reached the end of their service life."}}+{{ :a126:a126_-_h141_-_s153_aot_.pdf |2023, March 22: Alteration of Terrain application. "New steel poles will be installed. Existing conductors and static wire will be transferred to new steel poles."}}
  
 +{{ :s153:s-153_cup_5-15-2023.pdf |2023, March 15: Conditional Use Permit application for Greenland}}
  
  
-{{ :a126:r193_-_a126_-_h141_des_permit_with_waivers.pdf |2023, June 27: DES permit with waivers}} 
- 
-{{ :a126:a124_-_h141_-_s153_start_of_construction_notice.pdf |2023, May 23: Start of construction notice}} 
- 
-{{ :a126:a_126_-_h141_-_s153_des_permit_with_waivers.pdf |2023, May 21: DES permit with waivers}} 
- 
-{{ :a126:a126_-_h141_-_s153_aot.pdf |2023, May 18: Environmental Resources Map}} 
- 
-{{ :a126:r193_-_a121_-_h141_aot_permit_application.pdf |2023, May 5: AOT permit application}} 
- 
-{{ :a126:a126_-_h141_-_s153_aot_checklist.pdf |2023, April 3: AOT checklist}} 
- 
-{{ :a126:a126_-_h141_-_s153_aot_.pdf |2023, March 23: Alteration of Terrain application}} 
- 
-{{ ::oct_17_2018_seven_115kv_asset_conditions_lines_partial.pdf |2018, October 17, presentation to PAC, replace 49 structures, $8.3 million}} 
  
  
s-153.1697787705.txt.gz · Last modified: 2023/10/20 03:41 by sigridundset