s-153
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
s-153 [2023/10/20 03:50] – sigridundset | s-153 [2024/03/28 01:30] (current) – sigridundset | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== S-153 115kV line ====== | ====== S-153 115kV line ====== | ||
+ | The S153 line originates in Stratham and ends in Portsmouth. It shares the easement with the A-126, and a gas line. | ||
{{ : | {{ : | ||
- | {{ :a126:aot-2412_permit_rm.pdf |2023, June 27: Alteration of Terrain | + | {{ :3135:a-126_s-153_3135.pdf |2023, June 3, withdrawn DES permit |
- | specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7), and Env-Wq 1504.09, | + | |
- | + | ||
- | {{ : | + | |
{{ : | {{ : | ||
Line 20: | Line 17: | ||
{{ :: | {{ :: | ||
- | {{ :: | + | {{ :: |
- | {{ :r193_-_a121_-_h141_aot_permit_application.pdf |2023, May 5 AoT application}} | + | {{ ::s153:5-9-2023_a-126_h-141_s-153.pdf |2023, May 9: F&G permit conditions}} |
- | {{ ::a126:aot-2412_miscellaneous_r.pdf |2023, | + | {{ :a126:a126_-_h141_-_s153_aot_checklist.pdf |2023, |
- | {{ :r193_-_a121_-_h141_aot_permit_application.pdf |2023, | + | {{ :a126:a126_-_h141_-_s153_aot_.pdf |2023, |
- | {{ :a126:a126_-_h141_-_s153_aot_checklist.pdf |2023, | + | {{ :s153:s-153_cup_5-15-2023.pdf |2023, |
- | {{ : | ||
- | {{ :: | ||
s-153.1697788223.txt.gz · Last modified: 2023/10/20 03:50 by sigridundset