 ====== S-153 115kV line ====== ====== S-153 115kV line ======
  
 +The S153 line originates in Stratham and ends in Portsmouth. It shares the easement with the A-126, and a gas line.
  
 {{ :may_18_2023_e_pac_lines_map.png?linkonly |map of project location}} {{ :may_18_2023_e_pac_lines_map.png?linkonly |map of project location}}
  
-{{ :a126:aot-2412_permit_rm.pdf |2023, June 27: Alteration of Terrain permit waiving +{{ :3135:a-126_s-153_3135.pdf |2023, June 3, withdrawn DES permit application for construction}}
-specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7), and Env-Wq 1504.09,}} +
- +
-{{ :a126:aot-2412_plans.pdf |2023, June 16: Alteration of Terrain plans}}+
  
 {{ :a126:a124_-_h141_-_s153_start_of_construction_notice.pdf |2023, May 23: Start of construction notice}} {{ :a126:a124_-_h141_-_s153_start_of_construction_notice.pdf |2023, May 23: Start of construction notice}}
Line 20: Line 17:
 {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 16 out of 51 structures; $5. million}} {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 16 out of 51 structures; $5. million}}
  
-{{ ::2023_05_18_meeting_minutes_final.pdf |2023 may 18 PAC minutes}}+{{ ::2023_05_18_meeting_minutes_final.pdf |2023 May 18 PAC minutes}}
  
-{{ :r193_-_a121_-_h141_aot_permit_application.pdf |2023, May 5 AoT application}}+{{ ::s153:5-9-2023_a-126_h-141_s-153.pdf |2023, May 9: F&G permit conditions}}
  
-{{ ::a126:aot-2412_miscellaneous_r.pdf |2023, May 5cover letter for Alteration of Terrain application. "The proposed project includes the replacement of 76 existing utility structures on the R193, A126, and H141 transmission lines that must be replaced because they have reached the end of their service life."}}+{{ :a126:a126_-_h141_-_s153_aot_checklist.pdf |2023, April 3AOT checklist}}
  
-{{ :r193_-_a121_-_h141_aot_permit_application.pdf |2023, May 5; AoT application}}+{{ :a126:a126_-_h141_-_s153_aot_.pdf |2023, March 22: Alteration of Terrain application. "New steel poles will be installed. Existing conductors and static wire will be transferred to new steel poles."}}
  
-{{ :a126:a126_-_h141_-_s153_aot_checklist.pdf |2023, April 3AOT checklist}}+{{ :s153:s-153_cup_5-15-2023.pdf |2023, March 15Conditional Use Permit application for Greenland}}
  
-{{ :a126:a126_-_h141_-_s153_aot_.pdf |2023, March 22: Alteration of Terrain application}} 
  
-{{ ::oct_17_2018_seven_115kv_asset_conditions_lines_partial.pdf |2018, October 17, presentation to PAC, replace }} 
  
  